IMPROVING CONTRACTORS’ PERFORMANCE TO INCREASE ELECTRICAL LOCOMOTIVES (ELLOCO) AVAILABILITY IN GRASBERG BLOCKING CAVE (GBC) MINE

In a competitive and dynamic business era, contractor performance management is crucial for achieving operational efficiency and competitive advantage. This research aims to develop a conceptual framework to enhance contractor management and performance, addressing a key challenge in the business...

Full description

Saved in:
Bibliographic Details
Main Author: Cahya Gusprita, Dicky
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/83488
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:In a competitive and dynamic business era, contractor performance management is crucial for achieving operational efficiency and competitive advantage. This research aims to develop a conceptual framework to enhance contractor management and performance, addressing a key challenge in the business sector, which is the availability of ellocos performance. By adopting the triangulation approach, this study outlines systematic steps beginning with a deep understanding of user needs and expectations regarding contractor performance. The study employs a qualitative method to identify the root causes of the decline in elloco performance through the analysis of contractor management and performance. Improvement and monitoring are needed on contractor performance, with periodic monitoring every six months or annually. Data is collected through observation, unstructured interviews with supervisors, and documentation. Data analysis is conducted using the Miles and Huberman model with a triangulation approach to ensure the validity and reliability of the findings. The results indicate that implementing this conceptual framework provides clear and effective guidance for organizations in enhancing contractor performance. The use of this research design ensures that each step in the research process is carried out carefully and systematically, helping organizations address the challenge of ellocos performance availability and achieve their business goals. The implementation of this conceptual framework is expected to improve contractor performance and well-being in the dynamic business context.