IMPROVING CONTRACTORSâ PERFORMANCE TO INCREASE ELECTRICAL LOCOMOTIVES (ELLOCO) AVAILABILITY IN GRASBERG BLOCKING CAVE (GBC) MINE
In a competitive and dynamic business era, contractor performance management is crucial for achieving operational efficiency and competitive advantage. This research aims to develop a conceptual framework to enhance contractor management and performance, addressing a key challenge in the business...
Saved in:
Main Author: | Cahya Gusprita, Dicky |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/83488 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DECISION-MAKING ANALYSIS TO IMPROVE THE CURRENT CAVING BLASTING PRACTICE IN THE GBC UNDERGROUND MINE
by: Bakti Parulian, Hendro -
ENHANCING PERFORMANCE AND PRODUCTIVITY GRASBERG BLOCK CAVING PUMPING SYSTEM OPERATION MAINTENANCE DIVISION
by: Prameswari Kiranaratri, RR -
ALTERATION AND MINERALIZATION STUDY OF GRASBERG BLOCK CAVE (GBC) ELEVATION 3000 M, ERTSBERG DISTRICT, PAPUA
by: Jasmine Pratiwi, Kharina -
IMPLEMENTATION OF MAINTENANCE STRATEGY AND ASSET HEALTH MONITORING ON UNDERGROUND GBC PRODUCTION LOADER
by: David Siregar, Sahala -
PARAGENESIS ALTERASI DAN MINERALISASI ENDAPAN PORFIRI-SKARN Cu-Au GRASBERG BLOCK CAVE (GBC) SECTION GRS34, DISTRIK ERTSBERG, PAPUA, INDONESIA
by: Apriliani, Vini