IMPROVING TIME AND COST ESTIMATION OF WEST WANAGON SLOPE STABILITY PROJECT IN GRASBERG SURFACE MINE CLOSURE: A FUZZY LOGIC AND PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) INTEGRATION APPROACH

Accurate time and cost estimation is critical in the successful closure of large-scale mining projects such as the West Wanagon Slope Stability Project at the Grasberg Surface Mine. Historically, these estimations have been marked by inaccuracies, which have negatively affected the overall efficienc...

Full description

Saved in:
Bibliographic Details
Main Author: Gino Simanjuntak, Maychel
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/81410
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia