IMPROVING TIME AND COST ESTIMATION OF WEST WANAGON SLOPE STABILITY PROJECT IN GRASBERG SURFACE MINE CLOSURE: A FUZZY LOGIC AND PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) INTEGRATION APPROACH
Accurate time and cost estimation is critical in the successful closure of large-scale mining projects such as the West Wanagon Slope Stability Project at the Grasberg Surface Mine. Historically, these estimations have been marked by inaccuracies, which have negatively affected the overall efficienc...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/81410 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!