IMPROVING TIME AND COST ESTIMATION OF WEST WANAGON SLOPE STABILITY PROJECT IN GRASBERG SURFACE MINE CLOSURE: A FUZZY LOGIC AND PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) INTEGRATION APPROACH

Accurate time and cost estimation is critical in the successful closure of large-scale mining projects such as the West Wanagon Slope Stability Project at the Grasberg Surface Mine. Historically, these estimations have been marked by inaccuracies, which have negatively affected the overall efficienc...

Full description

Saved in:
Bibliographic Details
Main Author: Gino Simanjuntak, Maychel
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/81410
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:81410
spelling id-itb.:814102024-06-25T09:03:03ZIMPROVING TIME AND COST ESTIMATION OF WEST WANAGON SLOPE STABILITY PROJECT IN GRASBERG SURFACE MINE CLOSURE: A FUZZY LOGIC AND PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) INTEGRATION APPROACH Gino Simanjuntak, Maychel Manajemen umum Indonesia Theses Critical Path Analysis, Integration of Fuzzy Logic with PERT, Kepner Tregoe Problem Analysis, Mine Closure Project, PERT Analysis, Project Management, Slope Stability Project, Time & Cost Estimation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/81410 Accurate time and cost estimation is critical in the successful closure of large-scale mining projects such as the West Wanagon Slope Stability Project at the Grasberg Surface Mine. Historically, these estimations have been marked by inaccuracies, which have negatively affected the overall efficiency and effectiveness of the projects. This study specifically addresses the enduring issues of time and cost estimation inaccuracies within PT Freeport Indonesia's closure projects. By employing a comprehensive array of analytical techniques including KepnerTregoe Problem Analysis, Critical Path Analysis, PERT Analysis, and an innovative integration of Fuzzy Logic with PERT. The research endeavors to enhance the accuracy of these critical estimations. The investigation pinpoints several potential causes for the observed delays time and cost, among them are severe erosion at toe high slope dumps due to inadequate surface water control, the intricate technical demands of engineering and construction tasks, unexpected changes in project scope, uncertainties in resources, and shortcomings in risk and project management experience. By methodically tackling these issues through the methodologies employed, the study aims to construct a more resilient estimation framework capable of accommodating the complex uncertainties typical of mine closure projects. The expected result is a thoroughly validated model that not only elevates estimation practices but also significantly improves project management capabilities, thereby offering valuable insights into the effective integration of traditional and contemporary analytical techniques in project estimation. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Gino Simanjuntak, Maychel
IMPROVING TIME AND COST ESTIMATION OF WEST WANAGON SLOPE STABILITY PROJECT IN GRASBERG SURFACE MINE CLOSURE: A FUZZY LOGIC AND PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) INTEGRATION APPROACH
description Accurate time and cost estimation is critical in the successful closure of large-scale mining projects such as the West Wanagon Slope Stability Project at the Grasberg Surface Mine. Historically, these estimations have been marked by inaccuracies, which have negatively affected the overall efficiency and effectiveness of the projects. This study specifically addresses the enduring issues of time and cost estimation inaccuracies within PT Freeport Indonesia's closure projects. By employing a comprehensive array of analytical techniques including KepnerTregoe Problem Analysis, Critical Path Analysis, PERT Analysis, and an innovative integration of Fuzzy Logic with PERT. The research endeavors to enhance the accuracy of these critical estimations. The investigation pinpoints several potential causes for the observed delays time and cost, among them are severe erosion at toe high slope dumps due to inadequate surface water control, the intricate technical demands of engineering and construction tasks, unexpected changes in project scope, uncertainties in resources, and shortcomings in risk and project management experience. By methodically tackling these issues through the methodologies employed, the study aims to construct a more resilient estimation framework capable of accommodating the complex uncertainties typical of mine closure projects. The expected result is a thoroughly validated model that not only elevates estimation practices but also significantly improves project management capabilities, thereby offering valuable insights into the effective integration of traditional and contemporary analytical techniques in project estimation.
format Theses
author Gino Simanjuntak, Maychel
author_facet Gino Simanjuntak, Maychel
author_sort Gino Simanjuntak, Maychel
title IMPROVING TIME AND COST ESTIMATION OF WEST WANAGON SLOPE STABILITY PROJECT IN GRASBERG SURFACE MINE CLOSURE: A FUZZY LOGIC AND PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) INTEGRATION APPROACH
title_short IMPROVING TIME AND COST ESTIMATION OF WEST WANAGON SLOPE STABILITY PROJECT IN GRASBERG SURFACE MINE CLOSURE: A FUZZY LOGIC AND PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) INTEGRATION APPROACH
title_full IMPROVING TIME AND COST ESTIMATION OF WEST WANAGON SLOPE STABILITY PROJECT IN GRASBERG SURFACE MINE CLOSURE: A FUZZY LOGIC AND PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) INTEGRATION APPROACH
title_fullStr IMPROVING TIME AND COST ESTIMATION OF WEST WANAGON SLOPE STABILITY PROJECT IN GRASBERG SURFACE MINE CLOSURE: A FUZZY LOGIC AND PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) INTEGRATION APPROACH
title_full_unstemmed IMPROVING TIME AND COST ESTIMATION OF WEST WANAGON SLOPE STABILITY PROJECT IN GRASBERG SURFACE MINE CLOSURE: A FUZZY LOGIC AND PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) INTEGRATION APPROACH
title_sort improving time and cost estimation of west wanagon slope stability project in grasberg surface mine closure: a fuzzy logic and program evaluation and review technique (pert) integration approach
url https://digilib.itb.ac.id/gdl/view/81410
_version_ 1822009471999672320