REVISED PLANNING OF LAMBUR 2 X 2,1 MW MINI HYDRO POWER PLANT LAMBUR VILLAGE, KANDANGSERANG DISTRICT, PEKALONGAN REGENCY, CENTRAL JAVA PROVINCE
Saved in:
Main Author: | Chrespo Sinaga, Reynold |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/83563 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
TECHNICAL PLANNING OF THE 2 X 2.41 MW MINI HYDRO POWER PLANT LAMBUR IN PEKALONGAN REGENCY, CENTRAL JAVA
by: PUTRI PURNAMA (NIM : 15814036), OLIVIA -
REVISED PLANNING OF CIKOTOK MINI HYDRO POWER PLANT, LEBAK REGENCY, BANTEN.
by: Lasro Hamonangan Purba, Joshua -
Design of Penstock and Gate for Mini Hydro Power Plant With Capacity 10 MW.
by: Kurnia Halim, Peter -
The Planning of Weir Design for the Construction of Mini Hydro Power Plant in the Cirompang River, Cihikeu Village, Bungbulang, Garut Regency
by: Hardiyanti, Dini -
FRANCIS TURBINE 2 MW DESIGN WITH CASE STUDY KAMBANGAN MINI HYDRO POWER WITH HEAD 87 M AND DISCHARGE 2.8 M3/S
by: Danu Aditya Rachman, Rovky