SELECTION OF RIG FOR COMPLETION JOB BY USING ANALYTIC HIERARCHY PROCESS METHOD IN JATIBARANG FIELD

The Ministry of Energy and Mineral Resources, Directorate General of Oil and Gas said that in 2016 the price of oil reached US$ 26.63 per barrel. This decline caused activities in the oil industry to experience a sluggishness. However, in 2017 world oil prices rose to US$ 52.47 per barrel. This incr...

Full description

Saved in:
Bibliographic Details
Main Author: Asidik, Hasbi
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/83777
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:83777
spelling id-itb.:837772024-08-13T08:28:50ZSELECTION OF RIG FOR COMPLETION JOB BY USING ANALYTIC HIERARCHY PROCESS METHOD IN JATIBARANG FIELD Asidik, Hasbi Manajemen umum Indonesia Theses Completion Work, Drilling Rig, Contract Workover Rig, Own Workover Rig, Cost, Organizational Transformation, Analytical Hierarchy Process INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/83777 The Ministry of Energy and Mineral Resources, Directorate General of Oil and Gas said that in 2016 the price of oil reached US$ 26.63 per barrel. This decline caused activities in the oil industry to experience a sluggishness. However, in 2017 world oil prices rose to US$ 52.47 per barrel. This increase has encouraged Pertamina (Persero) to target production of 1.9 million BOEPD in 2025. Based on the SWOT Analysis, the advantage of the Jatibarang Field is that it has large oil reserves in the Akasia Bagus Development Field with the drilling of the ABG-08 well which produces 2600 BOPD. The author identifies the major concerns and root causes faced using the Kepner Tregoe Method. The development of new wells by drilling is a major concern of the planned business process and the high cost of rigs at the Job Completion stage is a problem faced. In 2021, PT Pertamina Hulu Rokan (Ex. CHEVRON), and PT Pertamina EP will become one under the Hulu Subholding PT Pertamina Hulu Energi due to organizational transformation. At PT PHR (Ex. CHEVRON), the drilling process with a Drill Rig is carried out until the production casing installation stage. Then the Completion work stage is continued by the Contract Workover Rig. This strategy has proven successful in the PT PHR Field (Ex. CHEVRON). This sparked the enthusiasm of PT Pertamina EP management to do the same thing. Furthermore, the author uses the Analytic Hierarchy Process (AHP) to choose which rig is suitable to overcome the problem based on the criteria of cost, time, rig availability, well location readiness and rig capacity. The results of AHP were obtained that the use of Drilling Rig is still the best alternative solution with a value of 59% compared to Contract Workover Rigs, and Own Workover Rigs. Meanwhile, Rig Capacity is the most important criterion with a value of 52%. So that the Completion Job will still be done using the Drilling Rig. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Asidik, Hasbi
SELECTION OF RIG FOR COMPLETION JOB BY USING ANALYTIC HIERARCHY PROCESS METHOD IN JATIBARANG FIELD
description The Ministry of Energy and Mineral Resources, Directorate General of Oil and Gas said that in 2016 the price of oil reached US$ 26.63 per barrel. This decline caused activities in the oil industry to experience a sluggishness. However, in 2017 world oil prices rose to US$ 52.47 per barrel. This increase has encouraged Pertamina (Persero) to target production of 1.9 million BOEPD in 2025. Based on the SWOT Analysis, the advantage of the Jatibarang Field is that it has large oil reserves in the Akasia Bagus Development Field with the drilling of the ABG-08 well which produces 2600 BOPD. The author identifies the major concerns and root causes faced using the Kepner Tregoe Method. The development of new wells by drilling is a major concern of the planned business process and the high cost of rigs at the Job Completion stage is a problem faced. In 2021, PT Pertamina Hulu Rokan (Ex. CHEVRON), and PT Pertamina EP will become one under the Hulu Subholding PT Pertamina Hulu Energi due to organizational transformation. At PT PHR (Ex. CHEVRON), the drilling process with a Drill Rig is carried out until the production casing installation stage. Then the Completion work stage is continued by the Contract Workover Rig. This strategy has proven successful in the PT PHR Field (Ex. CHEVRON). This sparked the enthusiasm of PT Pertamina EP management to do the same thing. Furthermore, the author uses the Analytic Hierarchy Process (AHP) to choose which rig is suitable to overcome the problem based on the criteria of cost, time, rig availability, well location readiness and rig capacity. The results of AHP were obtained that the use of Drilling Rig is still the best alternative solution with a value of 59% compared to Contract Workover Rigs, and Own Workover Rigs. Meanwhile, Rig Capacity is the most important criterion with a value of 52%. So that the Completion Job will still be done using the Drilling Rig.
format Theses
author Asidik, Hasbi
author_facet Asidik, Hasbi
author_sort Asidik, Hasbi
title SELECTION OF RIG FOR COMPLETION JOB BY USING ANALYTIC HIERARCHY PROCESS METHOD IN JATIBARANG FIELD
title_short SELECTION OF RIG FOR COMPLETION JOB BY USING ANALYTIC HIERARCHY PROCESS METHOD IN JATIBARANG FIELD
title_full SELECTION OF RIG FOR COMPLETION JOB BY USING ANALYTIC HIERARCHY PROCESS METHOD IN JATIBARANG FIELD
title_fullStr SELECTION OF RIG FOR COMPLETION JOB BY USING ANALYTIC HIERARCHY PROCESS METHOD IN JATIBARANG FIELD
title_full_unstemmed SELECTION OF RIG FOR COMPLETION JOB BY USING ANALYTIC HIERARCHY PROCESS METHOD IN JATIBARANG FIELD
title_sort selection of rig for completion job by using analytic hierarchy process method in jatibarang field
url https://digilib.itb.ac.id/gdl/view/83777
_version_ 1822998261213954048