PROJECT MANAGEMENT APPLICATION AND RECOMMENDATION OF TURNAROUND OIL REFINERY PROJECT RU V PERTAMINA
Turnaround projects in oil refineries are large-scale, recurring maintenance activities crucial for maintaining refinery reliability. During this project, the entire refinery is shut down (planned shutdown), necessitating meticulous project management. Delays can result in significant financia...
Saved in:
Main Author: | Andari Putri, Rima |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/83962 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SELECTING THE OPTIMUM PROJECT DELIVERY METHOD FOR GASOLINE SULFUR HYDROTREATING PROJECT AT RU-III PLAJU AND RU-VI BALONGAN REFINERIES OF PT KILANG PERTAMINA INTERNATIONAL (KPI) BY USING ANALYTIC HIERARCHY PROCESS (AHP)
by: Achmad Bastomi, Andry -
A project study on an edible soybean oil refinery
by: Alcuaz, Francisco
Published: (1964) -
PROPOSED TURNAROUND CORPORATE LEVEL STRATEGY FOR PERTAMINA
by: Dwi Lesmana, Yadi -
Evaluation of the effectiveness of oasys application on oil accounting department at Pertamina refinery unit VI Balongan
by: , IDRIS, Muhamad, et al.
Published: (2002) -
PROPOSED BUSINESS STRATEGY FOR PERTAMINA RU V BALIKPAPAN FACING CHALLENGES IN THE CRUDE OIL REFINING INDUSTRY
by: Heru Setiadi, Umar