PENINGAKATAN KAPASITAS INSTALASI PENGOLAHAN AIR (IPA) CIBINONG 2, KABUPATEN BOGOR
Groundwater is one of the alternatives to meet water demand, but it has limitations both in quality and quantity. Cibinong District, Bogor Regency is a densely populated metropolitan area. In the Bogor Regency RPJMD, the water service target is 100%, so it is necessary to uprate the capacity of wate...
Saved in:
Main Author: | Nauli K. Simanjuntak, Gabriella |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/84166 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
REDESAIN INSTALASI PENGOLAHAN AIR (IPA) DEKENG II, PDAM TIRTA PAKUAN KOTA BOGOR
by: Fathan Lazuardi, Muhammad -
PENINGKATAN KAPASITAS INSTALASI PENGOLAHAN AIR LIMBAH DOMESTIK (IPAL) TEGAL GUNDIL, KOTA BOGOR
by: Fatma Putri, Sanifa -
STUDI ALTERNATIF PENEMPATAN BANGUNAN
INSTALASI PENGOLAHAN AIR (IPA) DI WADUK SERMO
by: , Taufik Hidayat, et al.
Published: (2013) -
PERANCANGAN INSTALASI PENGOLAHAN AIR (IPA) DI KAWASAN ORANGE COUNTY, CIKARANG, KABUPATEN BEKASI, JAWA BARAT
by: Monica, Astrid -
WOMEN AND CHILDREN HOSPITAL IN CIBINONG, BOGOR
by: NABILA (NIM : 15214022), MAULIDINDA