STABILITY OF THE TUNNEL IN THE FRACTURE ZONE USING 3D NUMERICAL MODELING

This final project presents a case study on tunneling through a 42 meters fracture zone with a cover depth only 11 – 32 m. The tunnel, which will serve as a two – lane one way road, has a horseshoe shape with dimensions of 12.8 meters in width and 10.5 meters in height. This tunnel is in Samarind...

Full description

Saved in:
Bibliographic Details
Main Author: Faishol Arriq, Muhammad
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/84219
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia