FINANCIAL ANALYSIS OF THE PADALARANG â BANDUNGFEEDER TRAIN AS A KCJB FEEDER
The Padalarang – Bandung Feeder Train is planned as a supporting mode of transportation for the Jakarta – Bandung High-Speed Train (KCJB), connecting passengers to and/or from downtown Bandung. This study aims to assess the financial feasibility of the feeder train. The data were collected through...
Saved in:
Main Author: | Alfat Rizki Pratama, Muhammad |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/84229 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
THE DESIGN OF PADALARANG FLYOVER FOR TRANSPORT SYSTEM
by: Hartanto, Fitra -
DESIGN OF BORED PILES AND CANTILEVER RETAINING WALLS FOR PADALARANG FLY OVER
by: Faisal Mumtaz, Rezaldy -
ACCESSIBILITY EVALUATION ON THE ACCESS MODES TO THE COMMUTER STATIONS IN BANDUNG RAYA (CASE STUDY: CICALENGKA STATION, BANDUNG STATION, KIARACONDONG STATION, AND PADALARANG STATION)
by: Riandiatmi, Oktaviani -
FINANCIAL PERFORMANCE ANALYSIS TO FINANCIAL DISTRESS PREDICTION (ALTMAN Z-SCORE) IN BIG CONSTRUCTION SERVICES COMPANY
by: Wisnu Prabowo, Arianto -
DESIGN OF THE PRESTRESSED BOX GIRDER BRIDGE STRUCURE FOR A SECTION OF THE JAKARTA-BANDUNG HIGH-SPEED TRAIN STATION
by: Fajar Ichsan, Muhammad