PLANNING OF CIPANDAK MINI HYDRO POWER PLANT IN CIANJUR DISTRICT, WEST JAVA PROVINCE
PLN's electricity sales growth showed an average increase of 3.5% per year from 2015 to 2020. This increase was driven by an increase in population and improvements in electricity supply. Projections from the Electricity Supply Business Plan (RUPTL) show an increase in customers of 24.4 mill...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/84463 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:84463 |
---|---|
spelling |
id-itb.:844632024-08-15T15:11:03ZPLANNING OF CIPANDAK MINI HYDRO POWER PLANT IN CIANJUR DISTRICT, WEST JAVA PROVINCE Anggi Sapriadi, Moch. Indonesia Final Project PLM, Cipandak, Debit mainstay. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/84463 PLN's electricity sales growth showed an average increase of 3.5% per year from 2015 to 2020. This increase was driven by an increase in population and improvements in electricity supply. Projections from the Electricity Supply Business Plan (RUPTL) show an increase in customers of 24.4 million in 2021-2030 and an increase in electricity sales from 243 TWh in 2019 to 409 TWh in 2030. To avoid an electricity deficit that can harm the economy, an increase in electricity supply is needed. One of the rivers that has this potential is the River in the Cipandak Watershed, Cianjur Regency, West Java. This is based on the 2021-2030 PLN RUPTL, which is stated in the power plant potential in West Java Province, which can be adjusted to system needs. The results of the Cipandak PLTM Planning have a construction cost of IDR 50,354,040,998.00 with a gross income per year of IDR 13,340,452,114.00. The NPV value is obtained at RP.15,597,123,621, EIRR 13.57%, and BCR 1.30. Then the PBP value is 7 years, 5 months, 4 days, and the cost per MW is also obtained at Rp. 20,061,370,915.00. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
PLN's electricity sales growth showed an average increase of 3.5% per year from
2015 to 2020. This increase was driven by an increase in population and
improvements in electricity supply. Projections from the Electricity Supply Business
Plan (RUPTL) show an increase in customers of 24.4 million in 2021-2030 and an
increase in electricity sales from 243 TWh in 2019 to 409 TWh in 2030. To avoid
an electricity deficit that can harm the economy, an increase in electricity supply is
needed. One of the rivers that has this potential is the River in the Cipandak
Watershed, Cianjur Regency, West Java. This is based on the 2021-2030 PLN
RUPTL, which is stated in the power plant potential in West Java Province, which
can be adjusted to system needs. The results of the Cipandak PLTM Planning have
a construction cost of IDR 50,354,040,998.00 with a gross income per year of IDR
13,340,452,114.00. The NPV value is obtained at RP.15,597,123,621, EIRR
13.57%, and BCR 1.30. Then the PBP value is 7 years, 5 months, 4 days, and the
cost per MW is also obtained at Rp. 20,061,370,915.00. |
format |
Final Project |
author |
Anggi Sapriadi, Moch. |
spellingShingle |
Anggi Sapriadi, Moch. PLANNING OF CIPANDAK MINI HYDRO POWER PLANT IN CIANJUR DISTRICT, WEST JAVA PROVINCE |
author_facet |
Anggi Sapriadi, Moch. |
author_sort |
Anggi Sapriadi, Moch. |
title |
PLANNING OF CIPANDAK MINI HYDRO POWER PLANT IN CIANJUR DISTRICT, WEST JAVA PROVINCE |
title_short |
PLANNING OF CIPANDAK MINI HYDRO POWER PLANT IN CIANJUR DISTRICT, WEST JAVA PROVINCE |
title_full |
PLANNING OF CIPANDAK MINI HYDRO POWER PLANT IN CIANJUR DISTRICT, WEST JAVA PROVINCE |
title_fullStr |
PLANNING OF CIPANDAK MINI HYDRO POWER PLANT IN CIANJUR DISTRICT, WEST JAVA PROVINCE |
title_full_unstemmed |
PLANNING OF CIPANDAK MINI HYDRO POWER PLANT IN CIANJUR DISTRICT, WEST JAVA PROVINCE |
title_sort |
planning of cipandak mini hydro power plant in cianjur district, west java province |
url |
https://digilib.itb.ac.id/gdl/view/84463 |
_version_ |
1822998573912948736 |