COST-SCHEDULING ANALYSIS AND BIM UTILIZATION IN MODULAR CONSTRUCTION (CASE STUDY OF PT WIJAYA KARYA BANGUNAN GEDUNG TBK)
Saved in:
Main Author: | Nathaniel Sunarjo, Hintama |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/84523 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF INFLUENCE FACTORS IN THE IMPLEMENTATION OF MODULAR CONSTRUCTION IN INDONESIA
by: Nathaniel Sunarjo, Hintama -
PROCUREMENT INFORMATION SYSTEM DESIGN AT PT. Wijaya Karya Bangunan Gedung Tbk.
by: MUKTI NUGROHO NIM: 94516016, WIRASTO -
FINANCIAL FEASIBILITY STUDY FOR " SPASI" CONCESSION PROJECT AT PT. WIJAYA KARYA BANGUNAN GEDUNG TBK
by: Fajar Pramadhia, Ilham -
STRATEGI DIVISI EPC PT. WIJAYA KARYA TBK.DALAM BISNISENGINEERING-PROCUREMENT-CONSTRUCTION (EPC)
by: , Prima Lucky Hardianto, S. T, et al.
Published: (2012) -
RISK ASSESSMENT PADA PEKERJAAN INSTALASI PRECAST DI PROYEK PUNCAK CENTRAL BUSINESS DISTRICT (CBD) PT. WIJAYA KARYA BANGUNAN GEDUNG SURABAYA
by: AKMAL GHIFFARI, 151411713025
Published: (2018)