BIM4D-based scheduling for assembling and lifting in precast-enabled construction

This research addresses the problem of assembly scheduling in crane-assisted precast construction while considering issues of building layout interference and optimal crane lifting. Traditionally, assembly scheduling and lifting path planning are treated as two separate issues due to their distinct...

Full description

Saved in:
Bibliographic Details
Main Authors: Huang, Lihui, Pradhan, Roshan, Dutta, Souravik, Cai, Yiyu
Other Authors: School of Mechanical and Aerospace Engineering
Format: Article
Language:English
Published: 2022
Subjects:
Online Access:https://hdl.handle.net/10356/160752
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English