BIM4D-based scheduling for assembling and lifting in precast-enabled construction
This research addresses the problem of assembly scheduling in crane-assisted precast construction while considering issues of building layout interference and optimal crane lifting. Traditionally, assembly scheduling and lifting path planning are treated as two separate issues due to their distinct...
Saved in:
Main Authors: | Huang, Lihui, Pradhan, Roshan, Dutta, Souravik, Cai, Yiyu |
---|---|
Other Authors: | School of Mechanical and Aerospace Engineering |
Format: | Article |
Language: | English |
Published: |
2022
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/160752 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
BIM-based scheduling for precast assembly and tower crane lifting
by: Huang, Lihui
Published: (2021) -
An application of genetic algorithms to precast production scheduling
by: Chan, W.-T., et al.
Published: (2014) -
Coordinated rescheduling of precast production
by: ZENG ZHEN
Published: (2010) -
Production scheduling for precast plants using a flow shop sequencing model
by: Chan, W.T., et al.
Published: (2014) -
Automatic re-planning of lifting paths for robotized tower cranes in dynamic BIM environments
by: Dutta, Souravik, et al.
Published: (2022)