FINANCIAL ANALYSIS OF PT. HUTAMA KARYA (PERSERO) ON THE ASSIGNMENT OF THE TRANS SUMATRA TOLL ROAD PHASE 2 WITH A SERVICE-BASED PERIODIC FINANCING SCHEME (CASE STUDY: BETUNG â TEMPINO â JAMBI TOLL ROAD)
Based on Presidential Regulation (Perpres) Number 100 of 2014, it is updated through Presidential Regulation Number 131 of 2022, PT. Hutama Karya (Persero) (referred to as "PTHK") has been assigned by the government to complete the construction of Toll Roads in Sumatra in stages and sus...
Saved in:
Main Author: | Satyo Anggono, Pulung |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/84805 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUATION OF CONSTRUCTION SUPPORT BY THE GOVERNMENT THROUGH BUSINESS ENTITIES ON THE TRANS SUMATRA TOLL ROAD (CASE STUDY: TERBANGGI BESAR â KAYU AGUNG TOLL ROAD)
by: Cahyaning Putri, Hera -
ROAD SAFETY INVESTIGATION IN CIPULARANG TOLL ROAD
by: Nabila, Syahla -
INVESTMENT ANALYSIS FOR TRANS SUMATERA TOLL ROAD, BETUNGTEMPINO-JAMBI TOLL ROAD SECTION
by: Pramana, Heru -
EVALUATION OF SERANG â PANIMBANG TOLL ROAD PLANNING AND DESIGN
by: Triarsani Ramadhanti, Dizka -
EVALUATION OF TRANS SUMATRA TOLL ROAD PLANNING SECTION OF PEMATANG PANGGANG - KAYU AGUNG (STA 140+000 S.D. 161+600)
by: Fatra Hadi, Jehant