ANALYSIS OF OPERATION CAPABILITY OF TANJUNG JATI B 660 MW COAL-FIRED POWER PLANT AT 20% PARTIAL LOAD
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/84819 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:84819 |
---|---|
spelling |
id-itb.:848192024-08-18T20:40:04ZANALYSIS OF OPERATION CAPABILITY OF TANJUNG JATI B 660 MW COAL-FIRED POWER PLANT AT 20% PARTIAL LOAD Figo Octaviano Pratama, Louis Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/84819 text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
|
format |
Final Project |
author |
Figo Octaviano Pratama, Louis |
spellingShingle |
Figo Octaviano Pratama, Louis ANALYSIS OF OPERATION CAPABILITY OF TANJUNG JATI B 660 MW COAL-FIRED POWER PLANT AT 20% PARTIAL LOAD |
author_facet |
Figo Octaviano Pratama, Louis |
author_sort |
Figo Octaviano Pratama, Louis |
title |
ANALYSIS OF OPERATION CAPABILITY OF TANJUNG JATI B 660 MW COAL-FIRED POWER PLANT AT 20% PARTIAL LOAD |
title_short |
ANALYSIS OF OPERATION CAPABILITY OF TANJUNG JATI B 660 MW COAL-FIRED POWER PLANT AT 20% PARTIAL LOAD |
title_full |
ANALYSIS OF OPERATION CAPABILITY OF TANJUNG JATI B 660 MW COAL-FIRED POWER PLANT AT 20% PARTIAL LOAD |
title_fullStr |
ANALYSIS OF OPERATION CAPABILITY OF TANJUNG JATI B 660 MW COAL-FIRED POWER PLANT AT 20% PARTIAL LOAD |
title_full_unstemmed |
ANALYSIS OF OPERATION CAPABILITY OF TANJUNG JATI B 660 MW COAL-FIRED POWER PLANT AT 20% PARTIAL LOAD |
title_sort |
analysis of operation capability of tanjung jati b 660 mw coal-fired power plant at 20% partial load |
url |
https://digilib.itb.ac.id/gdl/view/84819 |
_version_ |
1822998781469130752 |