ANALYSIS OF OPERATION CAPABILITY OF TANJUNG JATI B 660 MW COAL-FIRED POWER PLANT AT 20% PARTIAL LOAD

Saved in:
Bibliographic Details
Main Author: Figo Octaviano Pratama, Louis
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/84819
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items