#TITLE_ALTERNATIVE#
Abstract: <br /> <br /> <br /> <br /> <br /> To add production capacities, UBPE Pongkor PT Antam, Tbk plan to make an incline shaft at Ciguha mine from level 500 to level 450. <br /> <br /> <br /> <br /> <br /> This research aim...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/8488 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |