#TITLE_ALTERNATIVE#
Abstract: <br /> <br /> <br /> <br /> <br /> To add production capacities, UBPE Pongkor PT Antam, Tbk plan to make an incline shaft at Ciguha mine from level 500 to level 450. <br /> <br /> <br /> <br /> <br /> This research aim...
Saved in:
Main Author: | Hakim (NIM 121 01 055), Lukman |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/8488 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: Deifan (NIM: 121 01 045), Ricky -
#TITLE_ALTERNATIVE#
by: Suharry (NIM 121 01 029) , Irwin -
#TITLE_ALTERNATIVE#
by: Ganda Wijaya (NIM 121 01 040) , Herdian -
#TITLE_ALTERNATIVE#
by: (NIM 150 03 055) , Bartholomeus -
#TITLE_ALTERNATIVE#
by: ZAIRIN (NIM 152 02 055), MUHAMMAD