METHODOLOGY ANALYSIS AND INSTALLATION SEQUENCE FOR 8â FLEXIBLE FLOWLINE
The target for oil and gas production in Indonesia is driving the development and application of various new strategies and technologies in the oil and gas industry. The Ministry of Energy and Mineral Resources is promoting the re-use of idle wells and the development of new deepsea wells to meet...
Saved in:
Main Author: | Farhana, Hasya |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/84975 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Flexible Flowlines: First Installation in Brunei
by: Paul Ong Pang Awn, et al.
Published: (2021) -
Boundary control of a flexible marine installation system
by: Ge, S.S., et al.
Published: (2014) -
INJECTION OF MONOETHYLENE GLYCOL TO PREVENT HYDRATE FORMATION IN DEEPWATER GAS-FIELD FLOWLINE
by: Parubak, Enos -
Injection of Monoethylene Glycol to Prevent Hydrate Formation in Deepwater Gas-Field Flowline
by: PARUBAK NIM: 23016014, ENOS -
PARAMETER STUDY OF OFFSHORE PIPELINES INSTALLATION USING S-LAY METHOD IN STATIC AND DYNAMIC CONDITION CASE STUDY: 16̉̉ INFIELD FLOWLINE TERANG-SIRASUN- BATUR OIL AND GAS FIELD DEVELOPMENT
by: ADRIPTA (NIM : 23109005); Pembimbing: Prof.Dr.Ir.Indra Nurhadi, PALKA