INSTALLATION AND FREE SPAN ANALYSIS OF SUBSEA PIPELINE ON PT RAMA KARYA PROJECT IN JAVA SEA

According to the National Energy General Plan (RUEN), Indonesia's oil demand will continue to increase until in 2050 it reaches until 3.97 million barrels of oil per day or 250% compared to current consumption. As stated by this policy, the installation of new pipelines is expected to increase...

Full description

Saved in:
Bibliographic Details
Main Author: Ramdhan, Rival
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/84991
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia