HYDRAULIC ANALYSIS AND FLOW ASSURANCE OF GAS TRUNKLINE & WATER INJECTION PIPELINE AT DAYUNG STATION FACILITIES, SOUTH SUMATRA

The high usage of crude oil and natural gas presents a challenge for oil & gas companies to maintain optimal production facilities. Performance degradation, such as decreased production well pressure, can reduce productivity. To address this, field life extension is necessary to optimize well pe...

Full description

Saved in:
Bibliographic Details
Main Author: Shadiqah, Sulthan
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/85410
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia