HYDRAULIC ANALYSIS AND FLOW ASSURANCE OF GAS TRUNKLINE & WATER INJECTION PIPELINE AT DAYUNG STATION FACILITIES, SOUTH SUMATRA
The high usage of crude oil and natural gas presents a challenge for oil & gas companies to maintain optimal production facilities. Performance degradation, such as decreased production well pressure, can reduce productivity. To address this, field life extension is necessary to optimize well pe...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/85410 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |