ANALYSIS OF CONSOLIDATION SETTLEMENT USING ANALYTICAL, NUMERICAL METHODS AND FIELD OBSERVATIONS. CASE STUDY : CONSTRUCTON OF INDRAPURA KISARAN TOL ROAD SECTION 1 STA 111+505 UNTIL STA 112+300

One of the most common occurred challenges on highway construction projects is the structural embankment that lies above soft soil surface, causing the problems such as long-term settlement, unstable embankment slope, and low subgrade bearing capacity. Proper and suitable soil improvement techniq...

Full description

Saved in:
Bibliographic Details
Main Author: Pramudia Novada, Fery
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/85425
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:85425
spelling id-itb.:854252024-08-20T13:56:53ZANALYSIS OF CONSOLIDATION SETTLEMENT USING ANALYTICAL, NUMERICAL METHODS AND FIELD OBSERVATIONS. CASE STUDY : CONSTRUCTON OF INDRAPURA KISARAN TOL ROAD SECTION 1 STA 111+505 UNTIL STA 112+300 Pramudia Novada, Fery Indonesia Theses Settlement; Consolidation; Prefabricated Vertical Drain; Finite Element Method; Asaoka Method INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/85425 One of the most common occurred challenges on highway construction projects is the structural embankment that lies above soft soil surface, causing the problems such as long-term settlement, unstable embankment slope, and low subgrade bearing capacity. Proper and suitable soil improvement technique shall be chosen to overcome those problems. This thesis presents the results of consolidation settlement study on the Indrapura-Kisaran Toll Road Construction Project based on analytical method, numerical method, and site observation results. The amount and duration of settlement was estimated analytically by using 1-D Terzaghi formula, and numerically by using Finite Element Method, to be compared with actual settlement by data using Asaoka method. The consolidation analysis was conducted by comparing settlement rate without Prefabricated Vertical Drain (PVD) and with PVD usage. The result shows that the analytical method produce highest settlement amount, whereas Asaoka method produce the lowest. The study sums up that it needs 2-5 days to reach 90% consolidation degree by using PVD, much faster than without PVD which needs up to 47 days. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description One of the most common occurred challenges on highway construction projects is the structural embankment that lies above soft soil surface, causing the problems such as long-term settlement, unstable embankment slope, and low subgrade bearing capacity. Proper and suitable soil improvement technique shall be chosen to overcome those problems. This thesis presents the results of consolidation settlement study on the Indrapura-Kisaran Toll Road Construction Project based on analytical method, numerical method, and site observation results. The amount and duration of settlement was estimated analytically by using 1-D Terzaghi formula, and numerically by using Finite Element Method, to be compared with actual settlement by data using Asaoka method. The consolidation analysis was conducted by comparing settlement rate without Prefabricated Vertical Drain (PVD) and with PVD usage. The result shows that the analytical method produce highest settlement amount, whereas Asaoka method produce the lowest. The study sums up that it needs 2-5 days to reach 90% consolidation degree by using PVD, much faster than without PVD which needs up to 47 days.
format Theses
author Pramudia Novada, Fery
spellingShingle Pramudia Novada, Fery
ANALYSIS OF CONSOLIDATION SETTLEMENT USING ANALYTICAL, NUMERICAL METHODS AND FIELD OBSERVATIONS. CASE STUDY : CONSTRUCTON OF INDRAPURA KISARAN TOL ROAD SECTION 1 STA 111+505 UNTIL STA 112+300
author_facet Pramudia Novada, Fery
author_sort Pramudia Novada, Fery
title ANALYSIS OF CONSOLIDATION SETTLEMENT USING ANALYTICAL, NUMERICAL METHODS AND FIELD OBSERVATIONS. CASE STUDY : CONSTRUCTON OF INDRAPURA KISARAN TOL ROAD SECTION 1 STA 111+505 UNTIL STA 112+300
title_short ANALYSIS OF CONSOLIDATION SETTLEMENT USING ANALYTICAL, NUMERICAL METHODS AND FIELD OBSERVATIONS. CASE STUDY : CONSTRUCTON OF INDRAPURA KISARAN TOL ROAD SECTION 1 STA 111+505 UNTIL STA 112+300
title_full ANALYSIS OF CONSOLIDATION SETTLEMENT USING ANALYTICAL, NUMERICAL METHODS AND FIELD OBSERVATIONS. CASE STUDY : CONSTRUCTON OF INDRAPURA KISARAN TOL ROAD SECTION 1 STA 111+505 UNTIL STA 112+300
title_fullStr ANALYSIS OF CONSOLIDATION SETTLEMENT USING ANALYTICAL, NUMERICAL METHODS AND FIELD OBSERVATIONS. CASE STUDY : CONSTRUCTON OF INDRAPURA KISARAN TOL ROAD SECTION 1 STA 111+505 UNTIL STA 112+300
title_full_unstemmed ANALYSIS OF CONSOLIDATION SETTLEMENT USING ANALYTICAL, NUMERICAL METHODS AND FIELD OBSERVATIONS. CASE STUDY : CONSTRUCTON OF INDRAPURA KISARAN TOL ROAD SECTION 1 STA 111+505 UNTIL STA 112+300
title_sort analysis of consolidation settlement using analytical, numerical methods and field observations. case study : constructon of indrapura kisaran tol road section 1 sta 111+505 until sta 112+300
url https://digilib.itb.ac.id/gdl/view/85425
_version_ 1822010722802991104