OPTIMIZATION OF CONTAINER STEVEDORING ACTIVITIES AT PT. PELINDO TERMINAL PETIKEMAS - TERMINAL PETIKEMAS SEMARANG

Performance of container stevedooring activities at Tanjung Emas Port, Semarang, which is managed by PT. Pelindo Terminal Petikemas – Terminal Petikemas Semarang is taking a long time because it is still below the standards set by the government. In this final assignment, we discuss ways to optimize...

Full description

Saved in:
Bibliographic Details
Main Author: Maulana Acyuta Dzaky, Rizky
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/85529
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Performance of container stevedooring activities at Tanjung Emas Port, Semarang, which is managed by PT. Pelindo Terminal Petikemas – Terminal Petikemas Semarang is taking a long time because it is still below the standards set by the government. In this final assignment, we discuss ways to optimize stevedooring activities at PT. Pelindo Terminal Petikemas – Terminal Petikemas Semarang. The optimization carried out is in the form of calculating existing stevedooring equipment schemes by taking into account optimization calculations in the form of B/C/H, utilization of stevedooring equipment, waiting time for stevedooring equipment, completion time for stevedooring activities, and BOR. In the existing conditions, the B/C/H was obtained at 20.48, CC equipment utilization was 100%, ARTG equipment utilization was 30%, HT equipment utilization was 78%, CC waiting time was 4.57 minutes, ARTG waiting time was 0 minutes, completion time for unloading activities and load of 593.21 minutes, and the BOR is not able to last up to 10 years. After optimizing by changing the composition of the stevedooring equipment scheme and replacing the container crane equipment, the B/C/H results were 29.27, CC equipment utilization was 98%, ARTG equipment utilization was 64%, HT equipment utilization was 92%, CC waiting time was 0.97 minutes , the ARTG waiting time is 0 minutes, the completion time for stevedooring g activities is 434.67 minutes, and the BOR can last up to 10 years by replacing two CCs and changing the scheme to one CC served by nine HTs and two ARTGs.