IMPROVEMENT OF PROJECT MANAGEMENT SYSTEM IN CONSTRUCTION DEVELOPMENT: A CASE STUDY OF THE UPPER CISOKAN HYDRO ELECTRIC POWER PLANT
This study focuses on optimizing project management systems in construction development, specifically in the case of the Upper Cisokan Hydro Electric Power Plant (UCPS HEPP). The project, with a 4x260 MW capacity, is critical for Indonesia's energy mix and environmental goals. However, signific...
Saved in:
Main Author: | Harianto Sinaga, Chandra |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/85752 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ECONOMIC AND FINANCIAL ANALYSIS OF UPPER CISOKAN PUMPED STORAGE HYDROELECTRIC POWER PLANT PROJECT
by: Hawari, Kahhar -
HYDRO POWER PLANT PARMONANGAN - 2 A FINANCIAL FEASIBILITY STUDY
by: Warjo -
DEVELOP RISK BASED BUDGETING STRATEGY FOR CIRATA HYDRO POWER PLANT
by: Vidi Nugraha, Dionisius -
FINANCING STRATEGY FOR ENCHANCE BUSINESS VALUE OF CIKANCANA MINI HYDRO POWWER PLANT PROJECT
by: Lintangcahya M, Avique -
FINANCIAL FEASIBILITY STUDY ON HYDRO POWER PLAN ON WEST SUMATERA
by: Razinda Kautsar, Sidhi