OPTIMIZATION OF STAFFING NUMBER AND PERSONNEL BUDGETING THROUGH STANDARDIZED JOB DESCRIPTIONS AND WORKLOAD ANALYSIS: A CASE STUDY OF OPERATIONS DIRECTOR 1'S PROJECTS AT PT WIJAYA KARYA (PERSERO) TBK

This research aims to address a critical business challenge by optimizing staffing levels and streamlining personnel budgeting at PT Wijaya Karya (Persero) TBK, through the standardization of job descriptions and determination of optimal personnel numbers. The study is driven by three primary resear...

Full description

Saved in:
Bibliographic Details
Main Author: Wicaksono Wahyu Utomo, Adibowo
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/85802
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia