PT. KLM is one of the coal producers in Indonesia with a production capacity of up to 55 million tons per year. The operational area includes sites A and B, covering a total area of approximately 65,000 hectares. In region A, coal is delivered by truck from the mine, then crushed, and subsequentl...

Full description

Saved in:
Bibliographic Details
Main Author: Paido Simatupang, Kondar
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/85838
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:85838
spelling id-itb.:858382024-09-11T13:52:41ZDETERMINING THE BEST ALTERNATIVE TO BUILD & OPERATE COAL CRUSHING FACILITIES; ANALYTIC HIERARCHY APPROACH Paido Simatupang, Kondar Manajemen umum Indonesia Theses Life of Mine, Alternative, Crusher, Rental, Economic Evaluation, Analytic Hierarchy Process (AHP), Super Decision Application. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/85838 PT. KLM is one of the coal producers in Indonesia with a production capacity of up to 55 million tons per year. The operational area includes sites A and B, covering a total area of approximately 65,000 hectares. In region A, coal is delivered by truck from the mine, then crushed, and subsequently transported to the port where it is loaded onto ships using a conveyor. Currently, the mining location is getting farther from the Coal Processing Plant (CPP). From the Life of Mine developed by the Company, the new Pit location is approximately 17 km from the existing CPP and about 7 km to the Coal Terminal. The economic evaluation study considers that the company is planning to build a crushing facility to reduce the operational costs of coal hauling near the pit. The case study for the financing plan of the new coal crushing facility close to the mining site presents 3 (three) alternatives: the construction of the facility by the company (capital expenditure) using its own funds, the construction of the facility by the company using leasing (loan), and the construction of the facility through a partnership with a third party under a rental scheme. The financial model shows all the feasibility parameters such as NPV, IRR, PI, and PBP across all scenarios. The research methodology involves analyzing problem trees and stakeholders to uncover business complexities and identify the root causes of issues. Qualitative data collection was conducted through semi-structured interviews. All alternatives were evaluated using Value-Focused Thinking (VFT), and the Analytic Hierarchy Process (AHP) method was employed to determine the best alternative, assisted by the Super Decision application. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Paido Simatupang, Kondar
DETERMINING THE BEST ALTERNATIVE TO BUILD & OPERATE COAL CRUSHING FACILITIES; ANALYTIC HIERARCHY APPROACH
description PT. KLM is one of the coal producers in Indonesia with a production capacity of up to 55 million tons per year. The operational area includes sites A and B, covering a total area of approximately 65,000 hectares. In region A, coal is delivered by truck from the mine, then crushed, and subsequently transported to the port where it is loaded onto ships using a conveyor. Currently, the mining location is getting farther from the Coal Processing Plant (CPP). From the Life of Mine developed by the Company, the new Pit location is approximately 17 km from the existing CPP and about 7 km to the Coal Terminal. The economic evaluation study considers that the company is planning to build a crushing facility to reduce the operational costs of coal hauling near the pit. The case study for the financing plan of the new coal crushing facility close to the mining site presents 3 (three) alternatives: the construction of the facility by the company (capital expenditure) using its own funds, the construction of the facility by the company using leasing (loan), and the construction of the facility through a partnership with a third party under a rental scheme. The financial model shows all the feasibility parameters such as NPV, IRR, PI, and PBP across all scenarios. The research methodology involves analyzing problem trees and stakeholders to uncover business complexities and identify the root causes of issues. Qualitative data collection was conducted through semi-structured interviews. All alternatives were evaluated using Value-Focused Thinking (VFT), and the Analytic Hierarchy Process (AHP) method was employed to determine the best alternative, assisted by the Super Decision application.
format Theses
author Paido Simatupang, Kondar
author_facet Paido Simatupang, Kondar
author_sort Paido Simatupang, Kondar
title DETERMINING THE BEST ALTERNATIVE TO BUILD & OPERATE COAL CRUSHING FACILITIES; ANALYTIC HIERARCHY APPROACH
title_short DETERMINING THE BEST ALTERNATIVE TO BUILD & OPERATE COAL CRUSHING FACILITIES; ANALYTIC HIERARCHY APPROACH
title_full DETERMINING THE BEST ALTERNATIVE TO BUILD & OPERATE COAL CRUSHING FACILITIES; ANALYTIC HIERARCHY APPROACH
title_fullStr DETERMINING THE BEST ALTERNATIVE TO BUILD & OPERATE COAL CRUSHING FACILITIES; ANALYTIC HIERARCHY APPROACH
title_full_unstemmed DETERMINING THE BEST ALTERNATIVE TO BUILD & OPERATE COAL CRUSHING FACILITIES; ANALYTIC HIERARCHY APPROACH
title_sort determining the best alternative to build & operate coal crushing facilities; analytic hierarchy approach
url https://digilib.itb.ac.id/gdl/view/85838
_version_ 1822010845929930752