INVESTMENT PROJECT ANALYSIS OF PUBLIC ROAD DIVERSION PLAN IN SOUTH GURIMBANG PIT, JOB SITE GURIMBANG MINE OPERATION - PT. BC
Gurimbang Mine Operation (GMO) is one of the mining concession locations with a Perjanjian Karya Pengusahaan Pertambangan Batubara (PKP2B) license granted by the Government to PT.BC. This site only began mining in 2021 with total coal reserves of 52 million MT that can be produced over approximately...
Saved in:
Main Author: | Patandung, Lukas |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/85844 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT PROJECT ANALYSIS OF RETAINING WALL FOR OPTIMIZING COAL PIT C2HU SAMBARATA MINING OPERATION IN PT BC
by: Sebastian, Ichsan -
INVESTMENT VALUATION OF LONG-TERM COAL MINING PROJECT AT PIT J BINUNGAN 8 (CASE STUDY PT BC)
by: Indra Subroto, Andhika -
INVESTMENT ANALYSIS OF THE CORRUGATED BRIDGE CONSTRUCTION PHASE V IN PIT C2HS JOB SITE SAMBARATA MINE OPERATION PT. BERAU COAL
by: Yulian, Tommy -
INVESTMENT ANALYSIS OF LOADPRO X60 AS COAL HAULING EQUIPMENT IN PIT A, SAMBARATA MINE OPERATIONS, PT. BERAU COAL
by: Ramadinata Yantoro, William -
INVESTMENT ANALYSIS OF CRUSHING STATION 11 UPGRADE TO SUPPORT COAL PRODUCTION IN PIT Z, BINUNGAN MINE OPERATIONS, PT. BERAU COAL
by: Fadhlullah Muharam, Adnan