INVESTMENT PROJECT ANALYSIS OF DUAL SYSTEM SUPPLY POWER STUDY CASE AT SITE SAMBARATA MINE OPERATION PT BERAU COAL
PT Berau Coal, is facing operational challenges in its Sambarata mine, primarily due to inconsistent power supply due to its single electricity supply system of four diesel generators. This affects the efficiency of the coal processing plant and productivity. The use of B30 fuel, a blend of biodiese...
Saved in:
Main Author: | Chandra Syaputra, Dwi |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/85850 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT ANALYSIS OF LOADPRO X60 AS COAL HAULING EQUIPMENT IN PIT A, SAMBARATA MINE OPERATIONS, PT. BERAU COAL
by: Ramadinata Yantoro, William -
SUSTAINABILITY AND DECISION MAKING COAL TRANSPORTATION AT COAL MINING PIT C2 SAMBARATA MINING OPERATION PT. BERAU COAL
by: Saputro, Arintoko -
INVESTMENT ANALYSIS OF THE CORRUGATED BRIDGE CONSTRUCTION PHASE V IN PIT C2HS JOB SITE SAMBARATA MINE OPERATION PT. BERAU COAL
by: Yulian, Tommy -
PROPOSED SOLUTION OPERATIONAL STRATEGY TO IMPROVE COAL PRODUCTION CASE STUDY SAMBARATA MINE OPERATION PT. BERAU COAL
by: Muflihhamim, Raihan -
PROPOSED STRATEGIC MINE PLANNING AND ECONOMIC VALUATION OF PIT C2H SAMBARATA PT BERAU COAL
by: Budiarto, Arif