DRILLING CONTRACTOR HIRING SELECTION USING ANALYTIC HIERARCHY PROCESS (AHP) METHOD IN GEOTHERMAL WELL CONSTRUCTION PROJECT
COP28 (Climate Change Conference) in Dubai concluded with an agreement that marks the "beginning of the end" for the fossil fuel era. The agreement urges parties to take global action to triple renewable energy capacity and double progess in energy efficiency by 2030. Indonesia is be...
Saved in:
Main Author: | Indrawan, Lavendo |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/85876 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SELECTION THE WINNER OF CONTRACTOR- SHARING CONTRACT BY USE OF ANALYTICAL HIERARCHY PROCESS (AHP) METHOD
by: NARULITA (NIM : 22208007); Pembimbing : Dr. Ir. Arsegianto, MAWARNI -
SELECTION THE WINNER OF CONTRACTOR- SHARING CONTRACT BY USE OF ANALYTICAL HIERARCHY PROCESS (AHP) METHOD
by: NARULITA (NIM : 22208007), MAWARNI -
DETERMINING THE BEST SOLUTION TO OVERCOME CIRCULATION LOSS IN DRILLING PSJ STRUCTURES USING ANALYTICAL HIERARCHY PROCESS (AHP)
by: Luhur Pambudhi, Tri -
The selection of ready-mixed concrete (RMC) supplier for DPWH projects using analytic hierarchy process (AHP)
by: Upao, Hakeem J.
Published: (2020) -
PROJECT SELECTION OF INDONESIAN LOCAL OIL AND GAS SERVICE COMPANY USING ANALYTICAL HIERARCHY PROCESS (AHP)
by: Adhi Pradana, Wibisono