EVALUATION OF OEM PRIORITIZATION TO SUPPORT GROWTH STRATEGY OF PT. SULZER INDONESIA IN >400MW STEAM TURBINE PRODUCT LINE
This study examines PT Sulzer Indonesia's strategic approach to expanding its >400MW steam turbine product line in Indonesia. The research aims to identify the most promising Original Equipment Manufacturers (OEMs) to target and develop an effective marketing strategy. Using a mixed-me...
Saved in:
Main Author: | Hutahaean, Jonatan |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/85883 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
A design of an 8,400-kw steam-turbine power plant
by: Feliciano, Vicente M.
Published: (1962) -
A design of a 4,400-kw steam turbine power plant
by: Infante, Emilio H.
Published: (1962) -
A project study on a 4,400 kw. steam turbine power plant
by: Balite, Jose B.
Published: (1962) -
400 MW gas turbine combined-cycle power plant: An extension of Huntley Power Station in New Zealand
by: Juvida, Jules C.
Published: (2004) -
Geothermal Steam Turbine Design at Inlet Pressure of 6.5 Bar and Power of 63 MW
by: Nawawi, Achmad