REDUCING LOSS PRODUCTION OPPORTUNITY (LPO) AT PT PERTAMINA EP DONGGI MATINDOK FIELD

PT. Pertamina EP Donggi Matindok Field (PEP DMF), as one of Pertamina (Persero)'s business units under the management of Subholding Upstream (SHU), has faced challenges due to a significant increase in Loss Production Opportunity (LPO) since 2023. It has been recorded that several production fa...

Full description

Saved in:
Bibliographic Details
Main Author: Wisnu Ady Kusmono, Bayu
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/85886
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:85886
spelling id-itb.:858862024-09-12T09:35:12ZREDUCING LOSS PRODUCTION OPPORTUNITY (LPO) AT PT PERTAMINA EP DONGGI MATINDOK FIELD Wisnu Ady Kusmono, Bayu Manajemen umum Indonesia Theses Loss Production, Fishbond, FMEA, Pareto, Kepner-Tregoe INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/85886 PT. Pertamina EP Donggi Matindok Field (PEP DMF), as one of Pertamina (Persero)'s business units under the management of Subholding Upstream (SHU), has faced challenges due to a significant increase in Loss Production Opportunity (LPO) since 2023. It has been recorded that several production facilities contributed to a production loss increase of 1339 percent, with potential revenue losses amounting to USD 1,706,574.20. This research was conducted to identify the root causes of the issues and recommend solutions to reduce the LPO at PEP DMF. Secondary data, based on LPO reports from the company, served as the quantitative data to initially formulate the problem and provide the basis for analysis. Meanwhile, primary data was obtained through qualitative data collection, specifically through focus group discussions (FGD). The results of the FGD were analyzed using a Fishbone Diagram, Failure Mode & Effect Analysis (FMEA), and Pareto Diagram to identify the root causes of the production facility issues leading to LPO. Subsequently, alternative solutions were evaluated using Kepner-Tregoe decision analysis to determine the best solution. The research findings state that "Frequent Unplanned Shutdown of Booster Compressor-B CPP Donggi significantly contributes to Loss Production Opportunity (LPO) at PEP DMF", and the solution to this problem is "The Replacement of the VSD (complete set) Booster Compressor-B CPP Donggi with a new brand that has domestic engineers and its spare parts are still being produced". Implementing this solution is expected to reduce the potential for LPO, ensuring that production activities at PEP DMF can run well. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Wisnu Ady Kusmono, Bayu
REDUCING LOSS PRODUCTION OPPORTUNITY (LPO) AT PT PERTAMINA EP DONGGI MATINDOK FIELD
description PT. Pertamina EP Donggi Matindok Field (PEP DMF), as one of Pertamina (Persero)'s business units under the management of Subholding Upstream (SHU), has faced challenges due to a significant increase in Loss Production Opportunity (LPO) since 2023. It has been recorded that several production facilities contributed to a production loss increase of 1339 percent, with potential revenue losses amounting to USD 1,706,574.20. This research was conducted to identify the root causes of the issues and recommend solutions to reduce the LPO at PEP DMF. Secondary data, based on LPO reports from the company, served as the quantitative data to initially formulate the problem and provide the basis for analysis. Meanwhile, primary data was obtained through qualitative data collection, specifically through focus group discussions (FGD). The results of the FGD were analyzed using a Fishbone Diagram, Failure Mode & Effect Analysis (FMEA), and Pareto Diagram to identify the root causes of the production facility issues leading to LPO. Subsequently, alternative solutions were evaluated using Kepner-Tregoe decision analysis to determine the best solution. The research findings state that "Frequent Unplanned Shutdown of Booster Compressor-B CPP Donggi significantly contributes to Loss Production Opportunity (LPO) at PEP DMF", and the solution to this problem is "The Replacement of the VSD (complete set) Booster Compressor-B CPP Donggi with a new brand that has domestic engineers and its spare parts are still being produced". Implementing this solution is expected to reduce the potential for LPO, ensuring that production activities at PEP DMF can run well.
format Theses
author Wisnu Ady Kusmono, Bayu
author_facet Wisnu Ady Kusmono, Bayu
author_sort Wisnu Ady Kusmono, Bayu
title REDUCING LOSS PRODUCTION OPPORTUNITY (LPO) AT PT PERTAMINA EP DONGGI MATINDOK FIELD
title_short REDUCING LOSS PRODUCTION OPPORTUNITY (LPO) AT PT PERTAMINA EP DONGGI MATINDOK FIELD
title_full REDUCING LOSS PRODUCTION OPPORTUNITY (LPO) AT PT PERTAMINA EP DONGGI MATINDOK FIELD
title_fullStr REDUCING LOSS PRODUCTION OPPORTUNITY (LPO) AT PT PERTAMINA EP DONGGI MATINDOK FIELD
title_full_unstemmed REDUCING LOSS PRODUCTION OPPORTUNITY (LPO) AT PT PERTAMINA EP DONGGI MATINDOK FIELD
title_sort reducing loss production opportunity (lpo) at pt pertamina ep donggi matindok field
url https://digilib.itb.ac.id/gdl/view/85886
_version_ 1822999328930660352