FINANCIAL FEASIBILITY ANALYSIS OF ENGINE CARBON CORRECTION AND CATALYTIC CARBON CORRECTION EQUIPMENT INVESTMENT FOR UNION MOTOR WORKSHOP
The study conducts the financial feasibility of investing in engine carbon correction and catalytic carbon correction equipment for Union Motor Workshop, an automobile repair firm situated in Tangerang, Banten. Faced with the decision to either purchase or lease the eco- innovative equipment, the st...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/86102 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:86102 |
---|---|
spelling |
id-itb.:861022024-09-13T13:39:46ZFINANCIAL FEASIBILITY ANALYSIS OF ENGINE CARBON CORRECTION AND CATALYTIC CARBON CORRECTION EQUIPMENT INVESTMENT FOR UNION MOTOR WORKSHOP Ajeng Estralita Aulia Andi Prameswari, Raden Indonesia Final Project Financial Feasibility Study, NPV, Risk Analysis, Automotive Industry, Leasing vs. Purchasing. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/86102 The study conducts the financial feasibility of investing in engine carbon correction and catalytic carbon correction equipment for Union Motor Workshop, an automobile repair firm situated in Tangerang, Banten. Faced with the decision to either purchase or lease the eco- innovative equipment, the study employs a comprehensive analysis using key financial metrics such as Payback Period (PP), Discounted Payback Period (DPP), Net Present Value (NPV), Profitability Index (PI), and Internal Rate of Return (IRR). In addition, a risk assessment is performed using sensitivity analysis to analyze the stability of financial outcomes throughout different scenarios. The study's findings suggest that leasing the equipment is the most beneficial financial option, offering a quicker return on investment, increased profitability, and decreased financial risk. Therefore, the research suggests that Union Motor Workshop might explore the option of leasing, as it is in line with the company's objectives of sustainability and long-term growth. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The study conducts the financial feasibility of investing in engine carbon correction and catalytic carbon correction equipment for Union Motor Workshop, an automobile repair firm situated in Tangerang, Banten. Faced with the decision to either purchase or lease the eco- innovative equipment, the study employs a comprehensive analysis using key financial metrics such as Payback Period (PP), Discounted Payback Period (DPP), Net Present Value (NPV), Profitability Index (PI), and Internal Rate of Return (IRR). In addition, a risk assessment is performed using sensitivity analysis to analyze the stability of financial outcomes throughout different scenarios. The study's findings suggest that leasing the equipment is the most beneficial financial option, offering a quicker return on investment, increased profitability, and decreased financial risk. Therefore, the research suggests that Union Motor Workshop might explore the option of leasing, as it is in line with the company's objectives of sustainability and long-term growth. |
format |
Final Project |
author |
Ajeng Estralita Aulia Andi Prameswari, Raden |
spellingShingle |
Ajeng Estralita Aulia Andi Prameswari, Raden FINANCIAL FEASIBILITY ANALYSIS OF ENGINE CARBON CORRECTION AND CATALYTIC CARBON CORRECTION EQUIPMENT INVESTMENT FOR UNION MOTOR WORKSHOP |
author_facet |
Ajeng Estralita Aulia Andi Prameswari, Raden |
author_sort |
Ajeng Estralita Aulia Andi Prameswari, Raden |
title |
FINANCIAL FEASIBILITY ANALYSIS OF ENGINE CARBON CORRECTION AND CATALYTIC CARBON CORRECTION EQUIPMENT INVESTMENT FOR UNION MOTOR WORKSHOP |
title_short |
FINANCIAL FEASIBILITY ANALYSIS OF ENGINE CARBON CORRECTION AND CATALYTIC CARBON CORRECTION EQUIPMENT INVESTMENT FOR UNION MOTOR WORKSHOP |
title_full |
FINANCIAL FEASIBILITY ANALYSIS OF ENGINE CARBON CORRECTION AND CATALYTIC CARBON CORRECTION EQUIPMENT INVESTMENT FOR UNION MOTOR WORKSHOP |
title_fullStr |
FINANCIAL FEASIBILITY ANALYSIS OF ENGINE CARBON CORRECTION AND CATALYTIC CARBON CORRECTION EQUIPMENT INVESTMENT FOR UNION MOTOR WORKSHOP |
title_full_unstemmed |
FINANCIAL FEASIBILITY ANALYSIS OF ENGINE CARBON CORRECTION AND CATALYTIC CARBON CORRECTION EQUIPMENT INVESTMENT FOR UNION MOTOR WORKSHOP |
title_sort |
financial feasibility analysis of engine carbon correction and catalytic carbon correction equipment investment for union motor workshop |
url |
https://digilib.itb.ac.id/gdl/view/86102 |
_version_ |
1822999432884387840 |