ANALYSIS OF WATER MANAGEMENT IN A COOPER-GOLD MINE DURING THE POST MINING PHASE WITH BIMODAL RAINFALL DISTRIBUTION

The PT XYZ mine, which employs the open pit mining method for copper and gold extraction, is approaching the post-mining phase set to begin in 2033. During the post-mining phase, it is necessary to conduct an analysis and evaluation of the existing drainage system since it will no longer be usabl...

Full description

Saved in:
Bibliographic Details
Main Author: Zahy Ghazian Ihsan, Muhamad
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/86294
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:86294
spelling id-itb.:862942024-09-17T12:58:14ZANALYSIS OF WATER MANAGEMENT IN A COOPER-GOLD MINE DURING THE POST MINING PHASE WITH BIMODAL RAINFALL DISTRIBUTION Zahy Ghazian Ihsan, Muhamad Indonesia Final Project Mine Drainage System, Runoff Hydrograph, Post-Mining, Drainage Facilities, Rainfall Pattern INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/86294 The PT XYZ mine, which employs the open pit mining method for copper and gold extraction, is approaching the post-mining phase set to begin in 2033. During the post-mining phase, it is necessary to conduct an analysis and evaluation of the existing drainage system since it will no longer be usable as it was during the mining operations. The planned drainage system includes a base plan for pit backfilling, excluding the eastern forest area, using a bimodal rainfall distribution that affects runoff characteristics. This study aims to analyze the planned drainage system, analyze the catchment area in the post-mining phase, analyze runoff hydrographs based on bimodal rainfall patterns, and provide recommendations for the drainage system design. The methods used include processing rainfall data, analyzing runoff hydrographs, designing drainage facilities, analyzing the catchment area in the post-mining phase, and evaluating the design. The research results indicate that changes in the catchment area are required in several areas. Additionally, the runoff hydrograph with a bimodal rainfall pattern produces two peak runoff flows, with the highest flow rate being 150.6 m³/s in the Barakebo Forest open channel. Recommendations for the drainage system include designing and dimensioning open channels, drop structures, and culverts to optimize postmining water management. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The PT XYZ mine, which employs the open pit mining method for copper and gold extraction, is approaching the post-mining phase set to begin in 2033. During the post-mining phase, it is necessary to conduct an analysis and evaluation of the existing drainage system since it will no longer be usable as it was during the mining operations. The planned drainage system includes a base plan for pit backfilling, excluding the eastern forest area, using a bimodal rainfall distribution that affects runoff characteristics. This study aims to analyze the planned drainage system, analyze the catchment area in the post-mining phase, analyze runoff hydrographs based on bimodal rainfall patterns, and provide recommendations for the drainage system design. The methods used include processing rainfall data, analyzing runoff hydrographs, designing drainage facilities, analyzing the catchment area in the post-mining phase, and evaluating the design. The research results indicate that changes in the catchment area are required in several areas. Additionally, the runoff hydrograph with a bimodal rainfall pattern produces two peak runoff flows, with the highest flow rate being 150.6 m³/s in the Barakebo Forest open channel. Recommendations for the drainage system include designing and dimensioning open channels, drop structures, and culverts to optimize postmining water management.
format Final Project
author Zahy Ghazian Ihsan, Muhamad
spellingShingle Zahy Ghazian Ihsan, Muhamad
ANALYSIS OF WATER MANAGEMENT IN A COOPER-GOLD MINE DURING THE POST MINING PHASE WITH BIMODAL RAINFALL DISTRIBUTION
author_facet Zahy Ghazian Ihsan, Muhamad
author_sort Zahy Ghazian Ihsan, Muhamad
title ANALYSIS OF WATER MANAGEMENT IN A COOPER-GOLD MINE DURING THE POST MINING PHASE WITH BIMODAL RAINFALL DISTRIBUTION
title_short ANALYSIS OF WATER MANAGEMENT IN A COOPER-GOLD MINE DURING THE POST MINING PHASE WITH BIMODAL RAINFALL DISTRIBUTION
title_full ANALYSIS OF WATER MANAGEMENT IN A COOPER-GOLD MINE DURING THE POST MINING PHASE WITH BIMODAL RAINFALL DISTRIBUTION
title_fullStr ANALYSIS OF WATER MANAGEMENT IN A COOPER-GOLD MINE DURING THE POST MINING PHASE WITH BIMODAL RAINFALL DISTRIBUTION
title_full_unstemmed ANALYSIS OF WATER MANAGEMENT IN A COOPER-GOLD MINE DURING THE POST MINING PHASE WITH BIMODAL RAINFALL DISTRIBUTION
title_sort analysis of water management in a cooper-gold mine during the post mining phase with bimodal rainfall distribution
url https://digilib.itb.ac.id/gdl/view/86294
_version_ 1822011006226792448