FUNCTIONAL SYSTEM CRITICALITY ASSESSMENT (FSCA) AND EQUIPMENT CRITICALITY ASSESSMENT (ECA) STUDIES: A CASE STUDY OF THE AMINE REGENERATION UNIT AT KILANG PERTAMINA BALIKPAPAN

Saved in:
Bibliographic Details
Main Author: Nurwanah, Afriani
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/86311
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items