FUNCTIONAL SYSTEM CRITICALITY ASSESSMENT (FSCA) AND EQUIPMENT CRITICALITY ASSESSMENT (ECA) STUDIES: A CASE STUDY OF THE AMINE REGENERATION UNIT AT KILANG PERTAMINA BALIKPAPAN
Saved in:
Main Author: | Nurwanah, Afriani |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/86311 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ESTIMASI WAKTU OPTIMUM PELAKSANAAN SHUTDOWN MAINTENANCE DI KILANG CDU BALIKPAPAN � PERTAMINA RU V
by: , AIN SAHARA, et al.
Published: (2012) -
Strategi Outsourcing jasa pemeliharaan kilang minyak Pertamina unit pengolahan IV Cilacap
by: , ATIHUTA, Pierre V, et al.
Published: (2003) -
Rawls: Critical assessments
by: KUKATHAS, Chandran
Published: (2003) -
PROPOSED IMPROVEMENT OF CONTRACTOR SELECTION FOR MAINTENANCE OF REACTOR EFFLUENT AIR COOLER USING VALUE-FOCUSED THINKING AND ANALYTIC HIERARCHY PROCESS AT PT KILANG PERTAMINA INTERNASIONAL RU V BALIKPAPAN
by: Dahri, Kurniawan -
Motivation and extracurricular activity (ECA) involvement as predictors of the ECA-to-school interface in Singapore
by: Leow, Charmaine Jia Min
Published: (2020)