EQUIPMENT CRITICALITY RATING PADA GAS SWEETENING SYSTEM
Equipment criticality rating is a method to determine the role of equipment to other equipment based on the impact of failures in the production process. The purpose of ECR is to simplify maintenance activity execution and provision of spare parts. By doing ECR, it is expected that the number of eme...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17100 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |