EQUIPMENT CRITICALITY RATING PADA GAS SWEETENING SYSTEM

Equipment criticality rating is a method to determine the role of equipment to other equipment based on the impact of failures in the production process. The purpose of ECR is to simplify maintenance activity execution and provision of spare parts. By doing ECR, it is expected that the number of eme...

Full description

Saved in:
Bibliographic Details
Main Author: JUNUS SILABAN (NIM : 1310706); Pembimbing Utama : Dr. Ing Tri Yuswidjajanto Zaenuri, RUBEN
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17100
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first