DESIGN OF DRAINAGE SYSTEM STRATEGY FOR MEETING WATER REQUIREMENTS OF THE PROCESSING PLANT DURING DRY PERIODS AT PT XYZ

PT XYZ has made progress in it’s phase 1 mining plans through the expansion of pits, the enlargement of the tailings storage facility, and other modifications to the openings, which collectively indicate an increase in production. This advancement has altered the morphology of the mining area surrou...

Full description

Saved in:
Bibliographic Details
Main Author: Arif Setyananda, M.
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/86389
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia