DESIGN OF DRAINAGE SYSTEM STRATEGY FOR MEETING WATER REQUIREMENTS OF THE PROCESSING PLANT DURING DRY PERIODS AT PT XYZ
PT XYZ has made progress in it’s phase 1 mining plans through the expansion of pits, the enlargement of the tailings storage facility, and other modifications to the openings, which collectively indicate an increase in production. This advancement has altered the morphology of the mining area surrou...
Saved in:
Main Author: | Arif Setyananda, M. |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/86389 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
MINE DRAINAGE FACILITIES PLANNING IN PIT OF COAL MINING PT XYZ
by: Indriani Amir, Lili -
MINE DRAINAGE FACILITY PLANNING ON THE RINJANI WASTEDUMP ON PT XYZ COAL MINE
by: Mutiara Saumi, Elvira -
MINE DRAINAGE FACILITY PLANNING AT WASTE DUMP COAL MINE OF PT XYZ
by: Ernasari, Meilia -
ANALYSIS OF DRAINAGE FACILITIES AND PEAK DISCHARGE LOAD IN THE RECLAMATION AREA OF PT XYZ
by: Agrianingrum, Anita -
MINE DRAINAGE FACILITY PLANNING OF SEMERU WASTE DUMP AT PT XYZ COAL MINE
by: Muhammad, Zaki