TIME SERIES-BASED SPAREPARTS PROCUREMENT RECOMMENDATION MODELLING FOR POWER PLANTS USING MACHINE LEARNING
To address the challenges of timely and efficient spare parts procurement, PT PLN Nusantara Power (PLN NP) requires an innovative approach to optimize the process and minimize operational risks. This study aims to develop a time-seriesbased recommendation model using machine learning methods, incl...
Saved in:
Main Author: | Mushawir, Ahmad |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/86670 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PREDICTION OF ENERGY PRODUCTION IN PHOTOVOLTAIC POWER PLANT BASED ON BIVARIATE TIME SERIES USING MACHINE LEARNING ALGORITHM
by: Pinantun Hamonangan, Tesla -
PREDICTION OF ENERGY PRODUCTION IN PHOTOVOLTAIC POWER PLANT BASED ON BIVARIATE TIME SERIES USING MACHINE LEARNING ALGORITHM
by: Pinantun Hamonangan, Tesla -
Machine learning for time series analysis
by: Wang, Ruyue
Published: (2023) -
Analisis persediaan Sparepart Pompa di BOB CPP Block
by: , SARI, Widiastuti Wulan, et al.
Published: (2004) -
Topological machine learning for multivariate time series
by: Wu, Chengyuan, et al.
Published: (2021)