FAILURE EVALUATION OF L-2 BLADE IN THE LOW-PRESSURE TURBINE OF SURALAYA UNIT 3 COAL-FIRED POWER PLANT WITH A CAPACITY OF 400 MW
This research focuses on failure evaluation of the L-2 blade in the lowpressure turbine at the Suralaya Unit 3 Steam Power Plant (PLTU) with a capacity of 400 MW. Turbine blade failure is a critical problem that can result in large losses, both operational and financial. The aim of this research...
Saved in:
Main Author: | Hadi Prabowo, Usman |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/87060 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
GEOMETRICAL REVERSE ENGINEERING OF THE BLADES OF PRIMARY AIR FAN FOR 660 MW COAL-FIRED THERMAL POWER PLANT
by: Setyawan, Sony -
INFLUENCE OF USING LOW RANK COAL DUE TO BOILER EFFICIENCY OF SURALAYA COAL FIRED POWER PLANT UNIT 3
by: TRI F (NIM : 23108326); Tim Pembimbing : Dr. Ir. Toto Hardianto; Prof. Dr. Ir. Aryadi Suwon, ANDIEK -
400 MW gas turbine combined-cycle power plant: An extension of Huntley Power Station in New Zealand
by: Juvida, Jules C.
Published: (2004) -
OPERATION PATTERN OF A COAL-FIRED POWER PLANT OBSERVED IN EBSILON PROFESSIONAL (CASE STUDY: SURALAYA POWER STATION)
by: SARUMPAET - NIM: 18013013 , ARJUNA -
ANALYSIS OF FINANCIAL FEASIBILITY TO CONSIDER THE BEST OPTION OF FLUE GAS DESULFURIZATION SYSTEM AT SURALAYA COAL FIRED STEAM POWER PLANT
by: JOSSI IMMANUEL (NIM : 291073230); Pembimbing: Eman Sumirat, SE, M Buss (Finance), AK , PATAR