PERANCANGAN PENGEMBANGAN TEMPAT PENGOLAHAN SAMPAH TERPADU DI TPS KELURAHAN RANCABOLANG, KECAMATAN GEDEBAGE, KOTA BANDUNG.

The city of Bandung has a very high population density, reaching 15,051 ????????????????????????/????????????. Along with population growth and increased public consumption in the city of Bandung, this will have an impact on the high emergence and variety of types of waste produced by the communit...

Full description

Saved in:
Bibliographic Details
Main Author: Setya Mahendra, Adnan
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/87493
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:87493
spelling id-itb.:874932025-01-30T12:36:26ZPERANCANGAN PENGEMBANGAN TEMPAT PENGOLAHAN SAMPAH TERPADU DI TPS KELURAHAN RANCABOLANG, KECAMATAN GEDEBAGE, KOTA BANDUNG. Setya Mahendra, Adnan Indonesia Final Project Black Soldier Fly, Gedebage District, Kompaksi, Plastic Pellets, TPST (Integrated Waste Processing Site), Windrow Composting INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/87493 The city of Bandung has a very high population density, reaching 15,051 ????????????????????????/????????????. Along with population growth and increased public consumption in the city of Bandung, this will have an impact on the high emergence and variety of types of waste produced by the community. This causes the city of Bandung to face increasingly complex waste management problems. The city of Bandung produces waste generation of 1,594.18 tons/day or 581,876.52 tons per year, so it requires a waste processing facility that is able to reduce the waste generation produced every day. And TPST (Integrated Waste Processing Site) is one of the means that can be used to overcome this problem. So, the Gedebage District scale TPST (Integrated Waste Processing Site) was designed to process domestic waste and garden waste. The design was carried out by sampling the waste generation in Gedebage District to obtain the amount of waste generation, the percentage composition of the waste and the density of the waste. This data is used as a basis for initial considerations in determining the processing technology to be applied. The selection of processing technology was carried out using the SAW (Simple Additive Weighting) method. The configuration of the selected processing technology is semimanual sorting, chopping, BSF (Black Soldier Fly), Windrow Composting, plastic pellets, and paper and metal compaction. And from the calculation results, this facility can process 48.03 tonnes/day of waste by producing 1.63 tonnes/day of dry larvae and 0.76 tonnes/day of compost. This TPST facility requires a minimum land area of 4,174.65 ????2. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The city of Bandung has a very high population density, reaching 15,051 ????????????????????????/????????????. Along with population growth and increased public consumption in the city of Bandung, this will have an impact on the high emergence and variety of types of waste produced by the community. This causes the city of Bandung to face increasingly complex waste management problems. The city of Bandung produces waste generation of 1,594.18 tons/day or 581,876.52 tons per year, so it requires a waste processing facility that is able to reduce the waste generation produced every day. And TPST (Integrated Waste Processing Site) is one of the means that can be used to overcome this problem. So, the Gedebage District scale TPST (Integrated Waste Processing Site) was designed to process domestic waste and garden waste. The design was carried out by sampling the waste generation in Gedebage District to obtain the amount of waste generation, the percentage composition of the waste and the density of the waste. This data is used as a basis for initial considerations in determining the processing technology to be applied. The selection of processing technology was carried out using the SAW (Simple Additive Weighting) method. The configuration of the selected processing technology is semimanual sorting, chopping, BSF (Black Soldier Fly), Windrow Composting, plastic pellets, and paper and metal compaction. And from the calculation results, this facility can process 48.03 tonnes/day of waste by producing 1.63 tonnes/day of dry larvae and 0.76 tonnes/day of compost. This TPST facility requires a minimum land area of 4,174.65 ????2.
format Final Project
author Setya Mahendra, Adnan
spellingShingle Setya Mahendra, Adnan
PERANCANGAN PENGEMBANGAN TEMPAT PENGOLAHAN SAMPAH TERPADU DI TPS KELURAHAN RANCABOLANG, KECAMATAN GEDEBAGE, KOTA BANDUNG.
author_facet Setya Mahendra, Adnan
author_sort Setya Mahendra, Adnan
title PERANCANGAN PENGEMBANGAN TEMPAT PENGOLAHAN SAMPAH TERPADU DI TPS KELURAHAN RANCABOLANG, KECAMATAN GEDEBAGE, KOTA BANDUNG.
title_short PERANCANGAN PENGEMBANGAN TEMPAT PENGOLAHAN SAMPAH TERPADU DI TPS KELURAHAN RANCABOLANG, KECAMATAN GEDEBAGE, KOTA BANDUNG.
title_full PERANCANGAN PENGEMBANGAN TEMPAT PENGOLAHAN SAMPAH TERPADU DI TPS KELURAHAN RANCABOLANG, KECAMATAN GEDEBAGE, KOTA BANDUNG.
title_fullStr PERANCANGAN PENGEMBANGAN TEMPAT PENGOLAHAN SAMPAH TERPADU DI TPS KELURAHAN RANCABOLANG, KECAMATAN GEDEBAGE, KOTA BANDUNG.
title_full_unstemmed PERANCANGAN PENGEMBANGAN TEMPAT PENGOLAHAN SAMPAH TERPADU DI TPS KELURAHAN RANCABOLANG, KECAMATAN GEDEBAGE, KOTA BANDUNG.
title_sort perancangan pengembangan tempat pengolahan sampah terpadu di tps kelurahan rancabolang, kecamatan gedebage, kota bandung.
url https://digilib.itb.ac.id/gdl/view/87493
_version_ 1823000023241064448