#TITLE_ALTERNATIVE#
Abstract: <br /> <br /> <br /> <br /> <br /> Reserves calculation can be done by method of vertical sections, which use geotechnical parameter as one of geometry pit boundaries. The calculation is done in each section and there are a lot of sections. This procedur...
Saved in:
Main Author: | Tri Prasetyo (NIM 121 03 010) , Novri |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/8848 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: Iman (NIM 121 02 010), Nur -
#TITLE_ALTERNATIVE#
by: Fatma (NIM 154 03 010) , Nina -
#TITLE_ALTERNATIVE#
by: Fawzia (NIM 152 03 010), Irma -
#TITLE_ALTERNATIVE#
by: Herdiana (NIM 124 03 010), Yudi -
#TITLE_ALTERNATIVE#
by: Yustiviani (NIM 172 03 010), Yasmina