Detail Risk Assessment for Pressure Vessel in Separation and Stabilization Unit in Central Processing Production Platform (CPP) (Case Study : North Belut)
Risk assessment is an activity to measure the risk level in a system and equipment. The purpose is to reduce the serious damage to safety, environment, and financial losses by the company if the equipment is damage or fail. Analysis and calculation has been done in order to find the risk level in re...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/9877 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |