Detail Risk Assessment for Pressure Vessel in Separation and Stabilization Unit in Central Processing Production Platform (CPP) (Case Study : North Belut)

Risk assessment is an activity to measure the risk level in a system and equipment. The purpose is to reduce the serious damage to safety, environment, and financial losses by the company if the equipment is damage or fail. Analysis and calculation has been done in order to find the risk level in re...

Full description

Saved in:
Bibliographic Details
Main Author: SYAFZA (NIM 13104072), ALFIYANDRA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/9877
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:9877
spelling id-itb.:98772017-09-27T10:41:03ZDetail Risk Assessment for Pressure Vessel in Separation and Stabilization Unit in Central Processing Production Platform (CPP) (Case Study : North Belut) SYAFZA (NIM 13104072), ALFIYANDRA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/9877 Risk assessment is an activity to measure the risk level in a system and equipment. The purpose is to reduce the serious damage to safety, environment, and financial losses by the company if the equipment is damage or fail. Analysis and calculation has been done in order to find the risk level in reference by DNV RP-G101 Code Risk Assessment of Offshore Topside Static Mechanical Equipment. As the case studies are equipments in Separation and Stabilization unit in Central Processing Production (CPP) Platform North Belut that located in Blok B, Natuna Sea. The purpose of these risk calculations is to get the risk level in the studied equipments. Moreover, exercise to some parameters also applied in this thesis to know and get the effect to the PoF and CoF.<p>The result from screening assessment level show that inlet gas separator bottom, inlet gas separator top, condensate separator bottom, and condensate separator top have a high risk level that will continue to detail assessment. And the result from detail assessment show that, equipment gas separator top have safety and economic consequence value 2,078 and US$ 11.618.216 and PoF 0,00485. And the condensate separator top have a value 0,579 for safety consequence and US$ 21.870.980 for economic consequence, and the PoF value is 0,00399. The exercise to some parameters that has been done, show the linear relation between pressure and dispersion modeling, and also between corrosion rate and the value of the probability of failure. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Risk assessment is an activity to measure the risk level in a system and equipment. The purpose is to reduce the serious damage to safety, environment, and financial losses by the company if the equipment is damage or fail. Analysis and calculation has been done in order to find the risk level in reference by DNV RP-G101 Code Risk Assessment of Offshore Topside Static Mechanical Equipment. As the case studies are equipments in Separation and Stabilization unit in Central Processing Production (CPP) Platform North Belut that located in Blok B, Natuna Sea. The purpose of these risk calculations is to get the risk level in the studied equipments. Moreover, exercise to some parameters also applied in this thesis to know and get the effect to the PoF and CoF.<p>The result from screening assessment level show that inlet gas separator bottom, inlet gas separator top, condensate separator bottom, and condensate separator top have a high risk level that will continue to detail assessment. And the result from detail assessment show that, equipment gas separator top have safety and economic consequence value 2,078 and US$ 11.618.216 and PoF 0,00485. And the condensate separator top have a value 0,579 for safety consequence and US$ 21.870.980 for economic consequence, and the PoF value is 0,00399. The exercise to some parameters that has been done, show the linear relation between pressure and dispersion modeling, and also between corrosion rate and the value of the probability of failure. <br />
format Final Project
author SYAFZA (NIM 13104072), ALFIYANDRA
spellingShingle SYAFZA (NIM 13104072), ALFIYANDRA
Detail Risk Assessment for Pressure Vessel in Separation and Stabilization Unit in Central Processing Production Platform (CPP) (Case Study : North Belut)
author_facet SYAFZA (NIM 13104072), ALFIYANDRA
author_sort SYAFZA (NIM 13104072), ALFIYANDRA
title Detail Risk Assessment for Pressure Vessel in Separation and Stabilization Unit in Central Processing Production Platform (CPP) (Case Study : North Belut)
title_short Detail Risk Assessment for Pressure Vessel in Separation and Stabilization Unit in Central Processing Production Platform (CPP) (Case Study : North Belut)
title_full Detail Risk Assessment for Pressure Vessel in Separation and Stabilization Unit in Central Processing Production Platform (CPP) (Case Study : North Belut)
title_fullStr Detail Risk Assessment for Pressure Vessel in Separation and Stabilization Unit in Central Processing Production Platform (CPP) (Case Study : North Belut)
title_full_unstemmed Detail Risk Assessment for Pressure Vessel in Separation and Stabilization Unit in Central Processing Production Platform (CPP) (Case Study : North Belut)
title_sort detail risk assessment for pressure vessel in separation and stabilization unit in central processing production platform (cpp) (case study : north belut)
url https://digilib.itb.ac.id/gdl/view/9877
_version_ 1820664821021933568