OPTIMALISASI SISTEM OPERASI CONCRETE MIXING BETON MENGGUNAKAN PANEL KONTROL
Concrete-mixing is the process of mixing the constituent materials of concrete - which is greatly affecting the quality of the concrete. A constituent material of concrete consists of several components: sand, cement, gravel, and water. The time of concrete-mixing implementation is based on the ASTM...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/121688/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=61785 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
id |
id-ugm-repo.121688 |
---|---|
record_format |
dspace |
spelling |
id-ugm-repo.1216882016-03-04T08:38:56Z https://repository.ugm.ac.id/121688/ OPTIMALISASI SISTEM OPERASI CONCRETE MIXING BETON MENGGUNAKAN PANEL KONTROL , IMAM FAUZI , Ir. FX. Sukidjo, M.T ETD Concrete-mixing is the process of mixing the constituent materials of concrete - which is greatly affecting the quality of the concrete. A constituent material of concrete consists of several components: sand, cement, gravel, and water. The time of concrete-mixing implementation is based on the ASTM (American Society for Testing and Materials) standards, while in operation, operators often make mistake in recording the time because they still rely on the stopwatch as a reference, so the concrete testing results are less valid. To overcome this problem, a control panel should be used to help the operation. With a control panel, operators have no need to record the time when the engine is off and on again because there is an automatic timer on the panel. The control panel is divided into two parts. The main part consists of the MCB, timers, relays and magnetic contactor. Another part consists of a push button lid, indicator lamp, selector switches and detent switches. This device control panel is designed to simplify concrete-mixing operating system and will be associated with concrete-testing so that the test results will be valid and reliable, with the time-length of concrete-mixing process that must be in accordance with the prescribed standards � the ASTM Standards for concrete and aggregate. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , IMAM FAUZI and , Ir. FX. Sukidjo, M.T (2013) OPTIMALISASI SISTEM OPERASI CONCRETE MIXING BETON MENGGUNAKAN PANEL KONTROL. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=61785 |
institution |
Universitas Gadjah Mada |
building |
UGM Library |
country |
Indonesia |
collection |
Repository Civitas UGM |
topic |
ETD |
spellingShingle |
ETD , IMAM FAUZI , Ir. FX. Sukidjo, M.T OPTIMALISASI SISTEM OPERASI CONCRETE MIXING BETON MENGGUNAKAN PANEL KONTROL |
description |
Concrete-mixing is the process of mixing the constituent materials of concrete - which is greatly affecting the quality of the concrete. A constituent material of concrete consists of several components: sand, cement, gravel, and water. The time of concrete-mixing implementation is based on the ASTM (American Society for Testing and Materials) standards, while in operation, operators often make mistake in recording the time because they still rely on the stopwatch as a reference, so the concrete testing results are less valid. To overcome this problem, a control panel should be used to help the operation.
With a control panel, operators have no need to record the time when the engine is off and on again because there is an automatic timer on the panel. The control panel is divided into two parts. The main part consists of the MCB, timers, relays and magnetic contactor. Another part consists of a push button lid, indicator lamp, selector switches and detent switches.
This device control panel is designed to simplify concrete-mixing operating system and will be associated with concrete-testing so that the test results will be valid and reliable, with the time-length of concrete-mixing process that must be in accordance with the prescribed standards � the ASTM Standards for concrete and aggregate. |
format |
Theses and Dissertations NonPeerReviewed |
author |
, IMAM FAUZI , Ir. FX. Sukidjo, M.T |
author_facet |
, IMAM FAUZI , Ir. FX. Sukidjo, M.T |
author_sort |
, IMAM FAUZI |
title |
OPTIMALISASI SISTEM OPERASI CONCRETE MIXING BETON MENGGUNAKAN PANEL KONTROL |
title_short |
OPTIMALISASI SISTEM OPERASI CONCRETE MIXING BETON MENGGUNAKAN PANEL KONTROL |
title_full |
OPTIMALISASI SISTEM OPERASI CONCRETE MIXING BETON MENGGUNAKAN PANEL KONTROL |
title_fullStr |
OPTIMALISASI SISTEM OPERASI CONCRETE MIXING BETON MENGGUNAKAN PANEL KONTROL |
title_full_unstemmed |
OPTIMALISASI SISTEM OPERASI CONCRETE MIXING BETON MENGGUNAKAN PANEL KONTROL |
title_sort |
optimalisasi sistem operasi concrete mixing beton menggunakan panel kontrol |
publisher |
[Yogyakarta] : Universitas Gadjah Mada |
publishDate |
2013 |
url |
https://repository.ugm.ac.id/121688/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=61785 |
_version_ |
1681231561658204160 |