MENURUNKAN DOWNTIME PROSES SETTING PRODUKSI LINE PARTS MAKING di PT. ASTRA NIPPON GASKET INDONESIA

To meet the challenges of competition in the international market, including the Indonesian company PT. Astra Nippon Gasket Indonesia take attention to the product quality and production efficiency. Industry development in Indonesia today demanded the company to be able to compete with the same comp...

Full description

Saved in:
Bibliographic Details
Main Authors: , AJI TRI PURNAMA, , Wikan Sakarinto, ST., M.Sc., Ph.D.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/122469/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62571
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.122469
record_format dspace
spelling id-ugm-repo.1224692016-03-04T08:21:45Z https://repository.ugm.ac.id/122469/ MENURUNKAN DOWNTIME PROSES SETTING PRODUKSI LINE PARTS MAKING di PT. ASTRA NIPPON GASKET INDONESIA , AJI TRI PURNAMA , Wikan Sakarinto, ST., M.Sc., Ph.D., ETD To meet the challenges of competition in the international market, including the Indonesian company PT. Astra Nippon Gasket Indonesia take attention to the product quality and production efficiency. Industry development in Indonesia today demanded the company to be able to compete with the same company, so as to improve the quality of the product and the amount of product will always be considered. In the production process in the making of parts is not always run smoothly, many problems can be found in the path, so that these problems can interfere with the efficiency and effectiveness of the production process. Issues raised in the making of parts can be determined by looking at the data daily production reports or it called the Daily Labor Report. From the data there is a high downtime on the process of setting requires a lot of time due to non-production while calling that have to walk back and forth to call the leader or dandori. To reduce production downtime caused by calling dandori leader and then make an instrument in the form of caller andon lights as a solution or dandori leader in calling for operator ease. The result of this evaluation indicate that the andon lamp products can increase productivity, lowering costs up to Rp. 26.52 million per month. Also, it can save energy operator to call the leader or dandori. The result will be focusing operator to operate the machine so that the quality of the product is maintained [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , AJI TRI PURNAMA and , Wikan Sakarinto, ST., M.Sc., Ph.D., (2013) MENURUNKAN DOWNTIME PROSES SETTING PRODUKSI LINE PARTS MAKING di PT. ASTRA NIPPON GASKET INDONESIA. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62571
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, AJI TRI PURNAMA
, Wikan Sakarinto, ST., M.Sc., Ph.D.,
MENURUNKAN DOWNTIME PROSES SETTING PRODUKSI LINE PARTS MAKING di PT. ASTRA NIPPON GASKET INDONESIA
description To meet the challenges of competition in the international market, including the Indonesian company PT. Astra Nippon Gasket Indonesia take attention to the product quality and production efficiency. Industry development in Indonesia today demanded the company to be able to compete with the same company, so as to improve the quality of the product and the amount of product will always be considered. In the production process in the making of parts is not always run smoothly, many problems can be found in the path, so that these problems can interfere with the efficiency and effectiveness of the production process. Issues raised in the making of parts can be determined by looking at the data daily production reports or it called the Daily Labor Report. From the data there is a high downtime on the process of setting requires a lot of time due to non-production while calling that have to walk back and forth to call the leader or dandori. To reduce production downtime caused by calling dandori leader and then make an instrument in the form of caller andon lights as a solution or dandori leader in calling for operator ease. The result of this evaluation indicate that the andon lamp products can increase productivity, lowering costs up to Rp. 26.52 million per month. Also, it can save energy operator to call the leader or dandori. The result will be focusing operator to operate the machine so that the quality of the product is maintained
format Theses and Dissertations
NonPeerReviewed
author , AJI TRI PURNAMA
, Wikan Sakarinto, ST., M.Sc., Ph.D.,
author_facet , AJI TRI PURNAMA
, Wikan Sakarinto, ST., M.Sc., Ph.D.,
author_sort , AJI TRI PURNAMA
title MENURUNKAN DOWNTIME PROSES SETTING PRODUKSI LINE PARTS MAKING di PT. ASTRA NIPPON GASKET INDONESIA
title_short MENURUNKAN DOWNTIME PROSES SETTING PRODUKSI LINE PARTS MAKING di PT. ASTRA NIPPON GASKET INDONESIA
title_full MENURUNKAN DOWNTIME PROSES SETTING PRODUKSI LINE PARTS MAKING di PT. ASTRA NIPPON GASKET INDONESIA
title_fullStr MENURUNKAN DOWNTIME PROSES SETTING PRODUKSI LINE PARTS MAKING di PT. ASTRA NIPPON GASKET INDONESIA
title_full_unstemmed MENURUNKAN DOWNTIME PROSES SETTING PRODUKSI LINE PARTS MAKING di PT. ASTRA NIPPON GASKET INDONESIA
title_sort menurunkan downtime proses setting produksi line parts making di pt. astra nippon gasket indonesia
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2013
url https://repository.ugm.ac.id/122469/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=62571
_version_ 1681231708971597824