METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A
Pile foundation also called in to work to take and hold the load acting on it , the construction load on to the ground layer as possible . In planning the pile foundation must be made with care and security that have been prescribed , including supporting the maximum load that may occur . The purpos...
Saved in:
Main Authors: | , |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/125226/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65391 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
id |
id-ugm-repo.125226 |
---|---|
record_format |
dspace |
spelling |
id-ugm-repo.1252262016-03-04T08:42:38Z https://repository.ugm.ac.id/125226/ METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A , ROY SEMPAKATA PERANGIN ANGIN , Dian Sestining Ayu, ST, MT. ETD Pile foundation also called in to work to take and hold the load acting on it , the construction load on to the ground layer as possible . In planning the pile foundation must be made with care and security that have been prescribed , including supporting the maximum load that may occur . The purpose of this study was to determine how the bored pile foundation and the methodology used to analyze the pile bearing capacity using SPT data from the field test in three (3 ) different points . Analyzes were performed using the method Poulos and Davis (1980 ) . Where the results of the calculations have been made it is known the value of the capacity of bored pile permits have different values , namely to DB - 1 at 935.89 kN , for DB - 2 of 1572.14 kN , and for DB - 3 is equal to 650 , 32Kn. So it can be concluded that the known value of capacity permitted pile foundation as it can be determined what to wear in order to be able to withstand the load to be carried by the foundation- [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , ROY SEMPAKATA PERANGIN ANGIN and , Dian Sestining Ayu, ST, MT. (2013) METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65391 |
institution |
Universitas Gadjah Mada |
building |
UGM Library |
country |
Indonesia |
collection |
Repository Civitas UGM |
topic |
ETD |
spellingShingle |
ETD , ROY SEMPAKATA PERANGIN ANGIN , Dian Sestining Ayu, ST, MT. METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A |
description |
Pile foundation also called in to work to take and hold the load acting on it ,
the construction load on to the ground layer as possible . In planning the pile
foundation must be made with care and security that have been prescribed ,
including supporting the maximum load that may occur .
The purpose of this study was to determine how the bored pile foundation and
the methodology used to analyze the pile bearing capacity using SPT data from the
field test in three (3 ) different points . Analyzes were performed using the method
Poulos and Davis (1980 ) . Where the results of the calculations have been made it is
known the value of the capacity of bored pile permits have different values , namely
to DB - 1 at 935.89 kN , for DB - 2 of 1572.14 kN , and for DB - 3 is equal to 650 ,
32Kn.
So it can be concluded that the known value of capacity permitted pile
foundation as it can be determined what to wear in order to be able to withstand the
load to be carried by the foundation- |
format |
Theses and Dissertations NonPeerReviewed |
author |
, ROY SEMPAKATA PERANGIN ANGIN , Dian Sestining Ayu, ST, MT. |
author_facet |
, ROY SEMPAKATA PERANGIN ANGIN , Dian Sestining Ayu, ST, MT. |
author_sort |
, ROY SEMPAKATA PERANGIN ANGIN |
title |
METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A |
title_short |
METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A |
title_full |
METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A |
title_fullStr |
METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A |
title_full_unstemmed |
METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A |
title_sort |
metode pelaksanaan pondasi bored pile apartement grand dhika city bekasi sektor 2a |
publisher |
[Yogyakarta] : Universitas Gadjah Mada |
publishDate |
2013 |
url |
https://repository.ugm.ac.id/125226/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65391 |
_version_ |
1681232223582289920 |