METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A

Pile foundation also called in to work to take and hold the load acting on it , the construction load on to the ground layer as possible . In planning the pile foundation must be made with care and security that have been prescribed , including supporting the maximum load that may occur . The purpos...

Full description

Saved in:
Bibliographic Details
Main Authors: , ROY SEMPAKATA PERANGIN ANGIN, , Dian Sestining Ayu, ST, MT.
Format: Theses and Dissertations NonPeerReviewed
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
Online Access:https://repository.ugm.ac.id/125226/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65391
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universitas Gadjah Mada
id id-ugm-repo.125226
record_format dspace
spelling id-ugm-repo.1252262016-03-04T08:42:38Z https://repository.ugm.ac.id/125226/ METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A , ROY SEMPAKATA PERANGIN ANGIN , Dian Sestining Ayu, ST, MT. ETD Pile foundation also called in to work to take and hold the load acting on it , the construction load on to the ground layer as possible . In planning the pile foundation must be made with care and security that have been prescribed , including supporting the maximum load that may occur . The purpose of this study was to determine how the bored pile foundation and the methodology used to analyze the pile bearing capacity using SPT data from the field test in three (3 ) different points . Analyzes were performed using the method Poulos and Davis (1980 ) . Where the results of the calculations have been made it is known the value of the capacity of bored pile permits have different values , namely to DB - 1 at 935.89 kN , for DB - 2 of 1572.14 kN , and for DB - 3 is equal to 650 , 32Kn. So it can be concluded that the known value of capacity permitted pile foundation as it can be determined what to wear in order to be able to withstand the load to be carried by the foundation- [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , ROY SEMPAKATA PERANGIN ANGIN and , Dian Sestining Ayu, ST, MT. (2013) METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65391
institution Universitas Gadjah Mada
building UGM Library
country Indonesia
collection Repository Civitas UGM
topic ETD
spellingShingle ETD
, ROY SEMPAKATA PERANGIN ANGIN
, Dian Sestining Ayu, ST, MT.
METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A
description Pile foundation also called in to work to take and hold the load acting on it , the construction load on to the ground layer as possible . In planning the pile foundation must be made with care and security that have been prescribed , including supporting the maximum load that may occur . The purpose of this study was to determine how the bored pile foundation and the methodology used to analyze the pile bearing capacity using SPT data from the field test in three (3 ) different points . Analyzes were performed using the method Poulos and Davis (1980 ) . Where the results of the calculations have been made it is known the value of the capacity of bored pile permits have different values , namely to DB - 1 at 935.89 kN , for DB - 2 of 1572.14 kN , and for DB - 3 is equal to 650 , 32Kn. So it can be concluded that the known value of capacity permitted pile foundation as it can be determined what to wear in order to be able to withstand the load to be carried by the foundation-
format Theses and Dissertations
NonPeerReviewed
author , ROY SEMPAKATA PERANGIN ANGIN
, Dian Sestining Ayu, ST, MT.
author_facet , ROY SEMPAKATA PERANGIN ANGIN
, Dian Sestining Ayu, ST, MT.
author_sort , ROY SEMPAKATA PERANGIN ANGIN
title METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A
title_short METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A
title_full METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A
title_fullStr METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A
title_full_unstemmed METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A
title_sort metode pelaksanaan pondasi bored pile apartement grand dhika city bekasi sektor 2a
publisher [Yogyakarta] : Universitas Gadjah Mada
publishDate 2013
url https://repository.ugm.ac.id/125226/
http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65391
_version_ 1681232223582289920