METODE PELAKSANAAN PONDASI BORED PILE APARTEMENT GRAND DHIKA CITY BEKASI SEKTOR 2A
Pile foundation also called in to work to take and hold the load acting on it , the construction load on to the ground layer as possible . In planning the pile foundation must be made with care and security that have been prescribed , including supporting the maximum load that may occur . The purpos...
Saved in:
Main Authors: | , ROY SEMPAKATA PERANGIN ANGIN, , Dian Sestining Ayu, ST, MT. |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/125226/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=65391 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universitas Gadjah Mada |
Similar Items
-
METODE PELAKSANAAN PONDASI TIANG PANCANG PADA PROYEK APARTEMENT GRAND DHIKA CITY BEKASI
SEKTOR 2A
by: , ANDREAS S. S SIRAIT, et al.
Published: (2014) -
PERHITUNGAN KAPASITAS DUKUNG AKSIAL FONDASI TIANG APARTEMEN GRAND DHIKA CITY BEKASI
by: , ULFA KHOIRUNITA G, et al.
Published: (2014) -
METODE PELAKSANAAN FONDASI BORED PILE DAN REDESIGN FONDASI TIANG PANCANG APARTMENT MALIOBORO CITY YOGYAKARTA
by: , MUHAMMAD ANHAR, et al.
Published: (2014) -
Evaluation of settlement of bored piles
by: Lee, Christopher Choon Sun.
Published: (2008) -
Bored piling practice in Singapore
by: Lim, You Swan.
Published: (2008)